BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a playground / park / athletic field in Merrill, Wisconsin. Completed plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.

The Lincoln County Forestry, Land and Parks Department is seeking to contract with an individual or entity to design, construct and install new vault toilet facilities at the New Wood Campground and Haymeadow Park. Proposals must conform to the requirements of the specifications and instructions. Quotations will be prepared for consideration by the Lincoln County Forestry, Land and Parks Committee at the August 14, 2023 Committee meeting. The Committee reserves the right to reject any or all quotations and accept any quotation or portion thereof they deem most advantageous to Lincoln County. Bid must be accompanied by a bond in the form of a certified check, cashier's check or money order in the amount of 10% of the bid, made payable to the Lincoln County Forestry, Land and Parks Department. The bond of unsuccessful bidders shall be returned. The bond for the successful bidder shall be retained or may be replaced by an acceptable Letter of Credit. Bond or Letter of Credit will be returned when the project is satisfactorily completed. Issuance of this request for proposal does not confer any rights to any prospective proposer and does not obligate Lincoln County to engage in any procurement or to purchase. Any costs associated with the preparation of a response to this request shall be the sole responsibility of the person submitting the proposal. The project consists of constructing a new vault toilet facility at the New Wood Campground and construction of a new vault toilet facility at Haymeadow County Park. The existing facilities at these two locations are not ADA accessible and in need of replacement. The new toilet facilities will be constructed at different locations than the current ones. Construction must be started after September 4, 2023 (Labor Day) and completed before 4:00 PM on November 3, 2023.

Post-Bid

Playgrounds / Parks / Athletic Fields

$300,000.00

Public - County

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
12
Bidding Soon
156
All Active Projects
65
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 2, 2023

September 4, 2023

img_map_placeholder

Multiple Locations, Merrill, WI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.