BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Saint Louis, Missouri. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

It is anticipated that the Bids will be considered by the Library District's Board of Trustees at their regular August 21, 2023 meeting after deliberation by the Selection Committee and recommendation to the Director and CEO. The Library District reserves the right to reject any and all Bids and to waive formalities in the best interest of the Library District. Clean, sealcoat, and re-stripe all asphalt driveways and parking areas to industry standards. Clean area to be sealcoated with high power blowers and steel brooms where necessary. The contractor will be responsible for cleaning cracks 3/8" or wider of dirt, debris and vegetation to insure bonding of crack sealing material. Seal these cracks with Craftco Roadsaver PLS or equivalent* hot pourable sealant. Scrub and treat oil spots with oil spot primer to aid the adhesion of sealer to these areas. Apply 2 coats of sand mixed Mac 52 by squeegee at the rate of 0.15 gallon per square yard. Allow sufficient drying time between coats. Other equivalent* pavement sealers will be considered but only as an Alternate. Mac 52 must be the Base Bid. Re-stripe to current lot design unless otherwise specified using safety yellow and handicap blue. Re-paint any painted curb or sidewalk edge with safety yellow or handicap blue on pedestrian ramps. The striping should be done within 48 hours of sealcoating (weather permitting). Coordinate all scheduling with Library's Manager of Building Systems. The successful bidder shall be responsible for not disrupting library staff and patrons. All work shall be performed outside of normal Library operating hours. The Library will make arrangements to have parking lot lighting turned on if necessary. Any subcontracting must be clearly noted in the response to the IFB. All insurance and certifications required of the bidder are also required of any subcontractor. Project (all branches) must be completed by October 22, 2023 Any bidder desiring an explanation or interpretation of this Invitation for Bid must request it in writing no later than 4:00 P.M. C.T. on July 19, 2023, and such request shall be emailed only to shunter@slcl.org

Award

Sidewalks / Parking Lot

$52,550.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
36
Bidding Soon
808
All Active Projects
317
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 2, 2023

September 1, 2023

img_map_placeholder

Multiple Locations, Saint Louis, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.