EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 12, 2023 at 8:00 PM

Updated October 1, 2024

Site work and paving for a bridge / tunnel in Wagoner, Oklahoma. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Bridge and Approaches and Bridge Rehabilitation Us-69: Over Union Pacific Railroad, 0.7 Miles and 1.6 Miles North of the Sh-51 Junction in Wagoner. Project Length = 1.473 Miles Counties: Wagoner Calendar Days: 390 Days Submit Any Questions or Concerns to the Office Engineer Division via: - Email: Odot-prebid.question@odot.org - Phone: (405) 521 - 2625 Please Include the Words " Pre-bid Question(S)" Along With the Call Order and the Bid Opening Date of the Project in Question in the Subject Line of the Correspondence. Unless Otherwise Specified in the Proposal, All Bids Must Be Submitted With a Proposal Guaranty Equal to 5% of the Bid Total. Bids Submitted Electronically Must Have Their Bid Bonds Verified Electronically Through The Electronic Bidding System. Written Bids Must Have Their Bond Stapled to the Back of the Proposal. In Lieu of a Bid Bond, a Certified/cashier's Check Made Payable to the Oklahoma Department of Transportation May Be Submitted as a Proposal Guaranty. Checks Must Be Delivered to Office Engineer Division Prior to the Bid Opening. Proposal Checks Will Be Held or Returned by the Department as Per Subsection 103.04 of the State Standard Specifications. OKDOT - 190 - Bridge and Approaches and Bridge Rehabilitation - Us-69 JPNS : 31209(04)C, 35087(07)C Questions and comments regarding the August 10, 2023 bid opening will be accepted until July 28, 2023. Please submit your questions through the ODOT pre-bid email address: ODOT-Prebid.Question@odot.org.

Award

Bridges / Tunnels

$11,790,918.00

Public - State/Provincial

Paving, Site Work

170

12

7

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Precast Concrete, Precast Structural Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels, Siding
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Fill, Backfill, Embankments, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
65
Bidding Soon
758
All Active Projects
381
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 10, 2023

January 8, 2024

img_map_placeholder

US-69, Wagoner, OK


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Bridge and Approaches and Bridge Rehabilitation - Us-69

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.