BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, new construction, renovation and addition to a clubhouse / community center in Fountain Hills, Arizona. Completed plans call for the addition of a clubhouse / community center; for the demolition of a clubhouse / community center; for the construction of a 391-square-foot clubhouse / community center; for the renovation of a clubhouse / community center; and for site work for a clubhouse / community center.

Existing outside space to be converted into an enclosed conditioned storage space which includes new non-rated exterior wall, adding a new door that will be accessed from the exterior and adding openings to existing exterior screen wall. In addition to providing needed storage space, recently completed flatwork is expected to eliminate water ponding and intrusion into the facility due to the original faulty grade. Permitting, Civil work, concrete and exterior screen wall demolition, grading and flatwork is complete. Project to include labor and materials to construct improvements, including: Fire alarm and sprinkler modifications to accommodate newly created space. Close and finish exterior screen wall cuts to match adjacent. Close and finish removed gate posts. Fill and finish to match adjacent. Existing canopy to remain, no work required. See Engineers drawings for fixtures and devices. Install new insulated door, hardware, frame and card reader. New walls, infill to match existing width and finish of adjacent walls. Infill openings to match adjacent construction and refinish entire wall for both interior and exterior sides. Existing ceiling to be repaired and repainted. Acoustical ceiling grid and tile to be replaced as needed. Electrical work/modifications as necessary to accommodate new equipment requirements and lighting specifications. Mechanical work necessary for installation of HVAC specified in drawings. Controls will be integrated with existing BMS system. System shall be tested and balanced. Roof work to accommodate specified penetrations and equipment mounting. Target Town Council Award Date: September 4, 2023 Anticipated Agreement Start Date: September 11, 2023 Questions are due in 21 days. Question Deadline Aug 10, 2023

Award

Clubhouse / Community Centers

$102,143.00

Public - City

Addition, Demolition, New Construction, Renovation, Site Work

20

3

2

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
23
Bidding Soon
707
All Active Projects
300
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 17, 2023

September 11, 2023

img_map_placeholder

13001 N La Montana Dr, Fountain Hills, AZ


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.