BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a transportation facility in Kiln, Mississippi. Completed plans call for site work for a transportation facility.

As of August 30, 2023, project was awarded to Sam B Day Construction , awarded amount is $484,255.10. The right is reserved by the Owner to reject any or all bids, to waive any informalities, and to award the Contract to serve the best interest of Owner The purpose of the geotechnical exploration was to evaluate general subsurface conditions within the proposed site, and to gather and present data relative to site preparation and foundation design for the proposed Corporate Hanger at the Stennis International Airport in Kiln, Mississippi. This work was conducted in accordance our proposal number Q1-18113 dated July 12, 2018. The following items were included as part of our scope of work: We understand that the project will consist of the design and construction of a new Corporate Hanger at the Stennis Airport in Kiln, Mississippi. The new hanger will be approximately 12,000 square feet (100 x 120) and will have an adjacent concrete apron with an area of approximately 1,350 square yards. The apron will be poured concrete pavement with similar buildup as the existing apron. Site grading is expected to be minimum with maximum cut and fills of 3 feet are less from existing site grades.

Award

Transportation Terminals

$484,255.00

Public - County

Site Work

28

21

16

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
95
Bidding Soon
1,032
All Active Projects
513
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 22, 2023

September 21, 2023

March 19, 2024

img_map_placeholder

7050 HOWARD CODY DRIVE KILN, MS, Kiln, MS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.