BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 18, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Columbus, Mississippi. Completed plans call for site work for a conference / convention center; for paving for a conference / convention center; sidewalk / parking lot; and conference / convention center.

For supplying all labor and materials (as specified) necessary for construction of "Trotter Convention Center Administrative Office ADA Ramp And Site Improvements." The above general outline of the work does not in any way limit the responsibility of the Contractor to perform all work and furnish all plant, labor, equipment, and materials required by the specifications and the drawings referred to therein. The contract time is 120 calendar days. Liquidated damages will be assessed in the amount of Two Hundred Dollars ($200.00) for each calendar day the Work has not achieved Substantial Completion. Special Damages - In addition to the amounts provided for liquidated damages, Contractor, in the event of such default, shall pay the Owner the actual costs reasonably incurred by Owner for engineering and inspection forces employed on the work after the time stipulated for the completion of the work. CERTIFICATE OF RESPONSIBILITY: Each contractor submitting a bid in excess of $50,000.00 must show on his bid and on the face of the envelope containing the bid, his Certificate of Responsibility Number, as required by Section 31-3-21 and 21-3-15, Mississippi Code of 1972. If the bid does not exceed $50,000.00, a notation so stating must appear on the face of the envelope. EVIDENCE: No bid will be opened, considered or accepted unless the above information is given as specified. Proposals shall be submitted in a sealed envelope and deposited with the City of Columbus prior to the hour and date herein before designated. No bidder may withdraw his bid within ninety (90) days after the actual date of the opening thereof. Each Bidder must deposit with his proposal, a Bid Bond or Certified Check in an amount equal to five percent (5%) of his bid, payable to the City of Columbus, as bid security. The successful bidder will be required to furnish a Payment Bond and Performance Bond each in the amount of one hundred percent (100%) of the contract amount. The City of Columbus hereby notifies all Bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, disadvantaged and women's business enterprises will be afforded the full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The City of Columbus reserves the right to reject any and all bids and to waive any informalities or irregularities there in.

Post-Bid

Conference / Convention Centers

$625,000.00

Public - City

Paving, Site Work

16

15

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
21
Bidding Soon
373
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 17, 2023

September 18, 2023

Project location map

402 2nd Ave N, Columbus, MS


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.