BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in Lincoln, Wisconsin. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Burnett County reserves the right to accept or reject any or all bids. Bridge Specifications: Bridge must comply with the Wisconsin DNR Bridge Guidelines for New and Replacement Snowmobile and All-Terrain Vehicle Bridges, PUB-CF-005 2017. This document can be found at the following link: http://dnr.wi.gov/files/PDF/pubs/cf/CF0005.pdf. The bridge is 42 feet long and 12 feet wide. Existing bridge deck must be removed in its entirety and disposed ofby contractor. Replacement deck shall consist oftwo layers of decking totaling not less than 3" thickness oftreated decking with a .40 treatment standard minimum. Current load capacity for the bridge is 12,000 lbs. As part ofthis project, load capacity must be increased to 25,000 lbs. based on certified engineered plans. See Wisconsin DNR Bridge Guidelines for more information on load requirements and additional supports needed to meet 25,000 lbs. New guardrails must be installed along the bridge approaches to replace existing guardrails. Guardrails must extend 10 feet from each comer ofthe bridge. A description ofthe proposed guardrail design and materials must be included with the bid. Specify all ofthe different hardware (size and gauge) that will be used for the project, as well has how many fasteners per board will be used. Contractor will be required to send engineered plans to Burnett County Forest & Parks within 60 days ofnotification ofsuccessful bid. A professional engineer qualified in structural engineering must stamp these plans. Failure to send professionally engineered plans within 60 days will be considered a contract violation and the contract will be terminated and performance bond kept for re-advertising and administration costs..

Post-Bid

Bridges / Tunnels

$300,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
19
Bidding Soon
262
All Active Projects
109
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 9, 2023

September 8, 2023

img_map_placeholder

Multiple Locations, Lincoln, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.