Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Waite Park, Minnesota. Design plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
As of September 8, 2023, project has been awarded. Various Traffic Signal Systems Throughout Stearns County TYPE OF WORK: Traffic Signal Modifications, Pedestrian Ramp Improvements Approximate major items of work are: 6" Concrete Walk 1380 SQ FT Concrete Curb & Gutter 460 LF Revise Signal System 20 SYS This section of County Road 157 is a 4.6-mile major collector roadway that serves residential, agricultural and commuter traffic. The roadway is a former trunk highway with an 18-foot concrete section beneath bituminous pavement. The existing road has 12-foot lanes with gravel shoulders averaging a four foot width. The terrain is mostly flat with several areas of wetland surrounding it. The 2017 AADT varies from 1400 at the westerly end to 2450 at the easterly end. Minimum wage rates to be paid by the Contractors have been predetermined and are subject to the Work Hours Act of 1962, P.L. 87-581 and implementing regulations. Bids must be accompanied by a certified check or corporate surety bond in favor of the County Auditor/Treasurer of Stearns County for at least five percent (5%) of the amount of the proposal. Bids will be considered for award of Contract at the first regular meeting of the Stearns County Board of Commissioners following the opening of bids. The County reserves the right to reject any or all bids and to waive any informalities. The method of Contractor Selection has not been Determined at this time.
Design
Roads / Highways
$1,510,777.00
Public - County
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 29, 2024
County Road 157, Waite Park, MN
Related To This Project
Waite Park, MN
--
Waite Park, MN
Bid Date: Feb 25 2021
Waite Park, MN
Bid Date: Jul 07 2021
Waite Park, MN
Bid Date: Mar 03 2022
Waite Park, MN
--
Waite Park, MN
Bid Date: Nov 15 2023
Waite Park, MN
Bid Date: Nov 09 2023
Waite Park, MN
Bid Date: Jan 11 2024
Waite Park, MN
Bid Date: Oct 31 2024
Waite Park, MN
Bid Date: Aug 10 2023
Waite Park, MN
Bid Date: Feb 28 2019
Waite Park, MN
Bid Date: Jul 19 2023
Waite Park, MN
Bid Date: Jun 28 2023
Waite Park, MN
Bid Date: May 25 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.