BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a medical facility in Hendersonville, North Carolina. Completed plans call for site work for a medical facility.

Henderson County requests proposals to provide a turnkey project inclusive of all labor, materials, cold weather additives or other additives, curing agents, traffic control, supervision, disposal fees, permits, inspections to demo and dispose existing concrete and repour and finish concrete steps and associated walkways and reinstall existing handrails and sidewalk lighting located at the Health Science located at 805 6th Avenue West, Hendersonville, NC. This work is to take place in coordination with Blue Ridge Community College, Wingate and Pardee Cancer Center scheduling needs. This may require work to be done during evenings and weekends. Contractor is to meet or exceed all requirements and specifications outlined in the attached drawings and details. Work area to be left in a clean and good condition. Time of Completion: Contractor must be complete by December 31st, 2023. Contractor must submit a timeline for beginning and completion of the project. Install all materials in accordance with manufacturers instructions and warranty requirements. Contractor is to obtain and pay for all required permits and inspections. Furnish the necessary supervision, labor, tools, equipment, and materials to complete the work outlined in the RFP and pre-bid meeting. Work schedule limitations to be coordinated with the Blue Ridge Community College Project Coordinator. Project includes disposal of concrete being replaced and debris offsite at the Contractors expense. The contractor will not be allowed to use College or Pardee dumpsters. Construction dumpsters will be the responsibility of the Contractor and at the Contractors expense. Contractor will provide traffic flaggers for any road or lane closures needed for delivery of equipment or work to be done. Daily Cleanup of all affected work areas and paths of entry and material delivery or removal. Any damage to buildings, walkways, pads, patios and foliage will be the responsibility of the Contractor to repair or replace at their expense. Henderson County requests proposals to provide a turnkey project inclusive of all labor, materials, cold weather additives or other additives, curing agents, traffic control, supervision, disposal fees, permits, inspections to demo and dispose existing concrete and repour and finish concrete steps and associated walkways and reinstall existing handrails and sidewalk lighting located at the Health Science located at 805 6th Avenue West, Hendersonville, NC. This work is to take place in coordination with Blue Ridge Community College, Wingate and Padre Cancer Center scheduling needs. This may require work to be done during evenings and weekends. Contractor is to meet or exceed all requirements and specifications outlined in the attached drawings and details. Work area to be left in a clean and good condition. Time of Completion: Contractor must be complete by December 31st , 2023. Contractor must submit a timeline for beginning and completion of the project. o Furnish the necessary supervision, labor, tools, equipment, and materials to complete the work outlined in the RFP and pre-bid meeting. o Work schedule limitations to be coordinated with the Blue Ridge Community College Project Coordinator. Project includes disposal of concrete being replaced and debris offsite at the Contractors expense. The contractor will not be allowed to use College or Pardee dumpsters. Construction dumpsters will be the responsibility of the Contractor and at the Contractors expense. All road closures for material delivery, debris removal, concrete trucks, pumper trucks, dump trucks etc. must be scheduled with the BRCC Project Coordinator in advance. August 4th, 2023 at 4:00pm. Questions must be in written form by email or USPS letter on or before, but NLT date indicated.

Post-Bid

Medical

$100,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
44
Bidding Soon
677
All Active Projects
319
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 17, 2023

September 18, 2023

img_map_placeholder

805 6th Ave W, Hendersonville, NC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.