EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 24, 2023 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Sugar Grove, Illinois. Completed plans call for site work for a water / sewer project.

Work on this contract requires that the contractor hold a current water well pump installation contractors license in good standing in the State of Illinois and that he demonstrates proof of his successful completion of 10 projects with similar scope within the past five years. The base bid shall include the cost to mobilize equipment, materials, and labor on site to pull the pump and submersible motor from each of two wells (Wells 1 and 2), and to reinstall a new pump and motor back into each well, disinfection, pump testing (minimum of 4 hours) after the new pump and motor are installed, checking electrical performance of the motor, and to de-mobilize upon completion of project. Bid security in the form of a bid bond or certified check in an amount equal to ten percent (10%) of the base bid amount shall be submitted with the bid Waubonsee Community College reserves the right to reject any or all Bids. Late, faxed and emailed Bids will not be considered The successful bidder will be required to provide a Performance and Payment Bond in the full amount of the contract, acceptable to the college All contracts for the construction of public works are subject to the Illinois Prevailing Wage Act (820) ILCS130/1-12). The last day for submittal of questions regarding the Bidding Documents is Friday, July 28th, 2023 at 5:00 pm.

Bid Results

Water / Sewer

$107,222.00

Public - County

Site Work

4

10

2

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Lifts

Find More Local Projects

Within 75 Miles of This Project
244
Active Projects
167
Bidding Soon
2,280
All Active Projects
995
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 3, 2023

September 4, 2023

img_map_placeholder

4S783 IL-47, Sugar Grove, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Well Upgrades Phase 1

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.