BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Gladstone, Missouri. Completed plans call for site work for a water / sewer project.

Project was awarded to Infrastructure-Solutions , including Bid Alternate A Project consists of the installation of 4,300 LF of 8 inch water main, 100 LF of 24 inch Storm Pipe and related appurtenances. The Owner reserves the right to accept or reject any or all Bids and to waive any technicalities, irregularities or informalities therein, to determine which is the lowest and best bid to accept and to approve the Bond. All wages paid for work under this Contract shall comply with requirements of the Prevailing Wage Law of the State of Missouri, Missouri Public Law 294, Sec. 290.210 through Sec. 290.340, R.S. Mo. 1969, as amended, and prevailing wages as established by the U. S. Department of Labor. The bidder is expected to base his bid on materials and equipment complying fully with the plans and specifications. In the event the bid is based on materials or equipment which do not conform, the bidder will be held responsible for furnishing materials and equipment which conform fully at no change in the bid price. Bid Bond or certified check on a reputable bank in the amount equal to five (5%) percent of the total amount of the Bid must accompany each Proposal. The bid deposit of the three lowest and best bidders will be returned within 48 hours after the executed contract and required bonds have been finally approved by the Owner. These Specifications and the Project Plans are intended to supplement, but not necessarily duplicate each other, and together constitute one complete set of Specifications and Plans so that any work exhibited in the one and not in the other, shall be executed just as if it has been set forth in both, in order that the work shall be completed according to the complete design. All other work shall be completed by May 31, 2024.

Award

Water / Sewer

$968,040.00

Public - City

Site Work

19

13

5

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
77
Bidding Soon
1,347
All Active Projects
535
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 8, 2023

September 8, 2023

May 31, 2024

img_map_placeholder

Multiple Locations, Gladstone, MO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.