BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Dexter, Iowa. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The work to be done at the location described in the specifications includes construction of Roundhouse Sidewalk and Drainage Improvements project, including all labor, materials and equipment necessary to construct approximately 154 SY of PCC sidewalk, 280 LF of 10" storm sewer by open cut, 260 LF of 6" tile line by open cut, cleanouts, fittings, mobilization, traffic control, surface restoration, erosion control, and miscellaneous associated work, including cleanup The Contractor submitting the successful Quotation will be required to furnish bond in an amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety approved by the Owner and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment for all materials and labor and protect and save harmless the Owner from claims and damages of any kind by the operations of the Contractor, and shall guarantee the work against faulty workmanship and materials for a period of four (4) years after its completion and acceptance by the Owner. The Contractor will be paid ninety-five percent (95%) of the Owners final estimate of value of acceptable work completed. Final payment will be made not earlier than thirty-one (31) days after completion of the work and acceptance by the Owner. No such final payment will be due until the Contractor has certified to the Owner that the materials, labor and services involved in the final estimate have been paid for in full. The work shall be substantially completed with the site stabilized by November 17, 2023. Final seeding shall be completed by May 31, 2024. Liquidated damages in the amount of Two Hundred Fifty Dollars ($250.00) per consecutive calendar day will be assessed for each day that the work shall remain uncompleted after the end of the contract period, with due allowance for extensions of the contract period due to conditions beyond the control of the Contractor.

Bid Results

Sidewalks / Parking Lot

$60,931.00

Public - City

Paving, Site Work

7

6

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
33
Bidding Soon
475
All Active Projects
270
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2023

September 7, 2023

img_map_placeholder

Multiple Locations, Dexter, IA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.