BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 6, 2025 at 7:00 PM

Updated February 7, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Albion, New York. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Replacement of Route 279 Bridge over Beardsley Creek in the Town of Carlton, Orleans County, New York. BIN 1044360. Disadvantaged Owned Sub-Contracting Goal: 5% Contract term: Completion by November 7, 2025 Questions regarding the Contract Plans and Documents for this project may be directed to Joel P. Astyk, P.E., Project Manager, Bergmann, at joel.astyk@collierseng.com. All questions shall be submitted in writing. Bids shall be accompanied by a Bid Security of not less than five percent (5%) of the amount of the Bid. Such Bid Security shall be submitted in the form of a Bid Bond. The submission shall be made with the understanding that the Bid Security shall guarantee that the Bidder will not withdraw their Bid for a period of forty-five (45) days after the scheduled closing time for the receipt of Bids: and that if their Bid is accepted, will enter into a formal contract with the Owner in accordance with the Form of Agreement; and that the required Performance and Payment Bond will be given; and that in the event of the withdrawal of said Bid within the said period of the failure to enter said Contract and give said bonds within ten (10) days after they have received notice of acceptance of the Bid, the Bidder shall be liable to the Owner for the full amount of the Bid Guarantee as liquidated damages to the Owner as a result of default of the Bidder The County of Orleans reserves the right to reject any or all bids, to waive any informality in any bids, and to award the Contract in the Countys best interest. The County reserves the right to make the award within forty-five (45) calendar days after the date of the bid opening during which period bids shall not be withdrawn. This project, the replacement of Route 279 bridge over Beardsley Creek, BIN 1044360, PIN 4BNY.52, will replace the existing Route 279 bridge over Beardsley Creek in the Town of Carlton, Orleans County. The project includes removal of the existing bridge, replacement with a 3-sided precast concrete structure, highway approach work and stream work Question Deadline 01/15/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer or Purchasing Department as having received the Bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not be answered.

Post-Bid

Bridges / Tunnels

$1,295,000.00

Public - County

Demolition, New Construction, Paving, Site Work

47

10

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
437
Active Projects
188
Bidding Soon
4,039
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 29, 2025

March 31, 2025

Project location map

NY-279, Albion, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.