Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 28, 2025 at 7:00 PM
Updated March 1, 2025
Site work and paving for a road / highway in San Antonio, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The scope of the proejct is to reconstruct approximately a 1.2 mile segment of the roadway of Sierra Sunset Road in east Bexar County. The limits of the project are from North Foster Road to approximately 380 feet east of the intersection Marin Island. This projec will include curb/sidewalks, bike lanes, storm sewer and new traffic signal at Woodlake Intersection. Note: San Antonio Water System (SAWS) and CPS Energy Gas utilities will be joint bidding with Bexar County to adjust and/or replace existing services within the project limits The general prevailing wage rates are established by the most current General Decision Number for Heavy Construction, listing Bexar County, State of Texas. A copy of the general prevailing wage rates is included in and shall become a part of these specifications. A cashier's check or bid bond, payable to the order of Bexar County, in an amount of not less than five percent (5%) of the total bid, must accompany each bid as a guarantee that if awarded the contract, the successful bidder will promptly enter into a contract and execute bonds on the standard forms provided, as outlined in the specifications and contract documents.A Performance Bond, in an amount of not less than one hundred percent (100%) of the contract price, conditioned upon the faithful performance of the contract, will be required. A Payment Bond in an amount of not less than one hundred percent (100%) of the contract price. Delay penalties for this contract shall be $700.00 per working day for each day beyond the specified 443 working days completion time. The County reserves the right to reject any and all bids and waive any formalities.
Bid Results
Roads / Highways
$10,130,735.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 28, 2025
April 28, 2025
Sierra Sunset, San Antonio, TX
Related To This Project
San Antonio, TX
--
San Antonio, TX
Bid Date: Aug 10 2023
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
Bid Date: Aug 29 2023
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
Bid Date: Aug 14 2023
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
Bid Date: Sep 01 2023
San Antonio, TX
Bid Date: Aug 07 2023
San Antonio, TX
Bid Date: Aug 07 2023
Unlock Your Potential with Access to Commercial Construction Data
Sign up now to get free company and project data. No payment required.
