Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 28, 2025 at 8:00 PM
Updated November 7, 2025
Site work and renovation of a water / sewer project in Morning Sun, Iowa. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
Per email from engineer project postponed. Addendum will be issued with new bid date. The project shall consist of providing all materials, equipment and labor necessary to install the work as defined as follows: Base Bid: Construction of 20' X 30' timber framed building including reinforced concrete foundation, metal siding and roofing, electrical, process piping, and HVAC systems. Construction of Integrated Nitrification Reactor including reinforced concrete tanks, electrical, aeration, control, and process piping systems. Provide and install lagoon aeration system. Construction and installation of various flow control structures and associated piping. Work includes all necessary grading, erosion control, mobilization water and natural gas service piping and other associated appurtenances and miscellaneous work items. All Work and equipment are to be in accordance with the Plans, Specifications and Contract Documents on file with the City Clerk of the City of Morning Sun, Iowa, which are by this reference made a part of this Notice as though fully set out and incorporated herein. Bid security in the form of a cashier's check or certified check drawn on a state-chartered or federally chartered bank, or a certified share draft drawn on a state-chartered or federally chartered credit union, or a bidder's bond with corporate surety satisfactory to the City, in the amount of 10% of the bid. PERFORMANCE/ PAYMENT /MAINTENANCE BOND: One hundred percent (100%) of the bid, with a maintenance period of three (3) years from the time of final project acceptance by the Owner. Work shall commence within ten (10) calendar days after receipt of the written "Notice to Proceed". All work shall be completed by November 1, 2026 subject to any time extension that may be granted by the Council. CDBG Project #23-WS-029 EPA Reference # EPA-CEP-01 Question Deadline 02/14/2025
Post-Bid
Water / Sewer
$150,000.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 28, 2025
April 28, 2025
To Be Determined, Morning Sun, IA
Related To This Project
Morning Sun, IA
Bid Date: Feb 17 2022
Cedar Rapids, IA
Bid Date: Aug 07 2023
Cedar Rapids, IA
Bid Date: Aug 07 2023
Davenport, IA
Bid Date: Aug 17 2023
Cedar Rapids, IA
Bid Date: Aug 17 2023
Newton, IA
Bid Date: Aug 17 2023
Marshalltown, IA
Bid Date: Sep 06 2023
Dubuque, IA
Bid Date: Aug 17 2023
Durant, IA
Bid Date: Aug 08 2023
Waukee, IA
Bid Date: Aug 15 2023
Grimes, IA
Bid Date: Aug 15 2023
Ames, IA
Bid Date: Aug 03 2023
Sioux City, IA
Bid Date: Feb 27 2019
Sioux City, IA
Bid Date: May 28 2019
Sioux City, IA
Bid Date: Feb 28 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
