BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Tinley Park, Illinois. Completed plans call for site work for a water / sewer project.

Site Directions: Southeast corner of 183rd St. and Ridgeland Ave. Landscaping, Water Resources Infrastructure, Water Infrastructure (Water Meters) This project shall consist of the removal of the two (2) existing water meters and associated strainers, and installation of two (2) new 16-inch water meters within existing water meter vaults in Tinley Park at Post 2, at the Southeast corner of 183rd Street and Ridgeland Avenue. The work will also include the installation of two (2) vaults above the existing water main with a 1-inch corp stop tapped into the existing main. The scope of this work shall include but not be limited to the following: . Remove existing water meters and strainers. . Install new water meters, provided by the Village, including electrical installation and Pipe accessories as needed to fit existing. . Pressure test and disinfect water meter prior to being placed into service. . Construct concrete valve vaults for the corp stops. . Tap existing main with each corp stop. . Restore the surface of the disturbed areas to be the same or better than the preconstruction condition This project shall consist of the removal and installation of two pre-purchased water meters with all necessary appurtenances, and two corporation stops with valve vaults, as according to the plans and special provisions. Bids will only be accepted from experienced Contractors who are under contract for and/or have completed a minimum of 3 (three) municipal or private utility water meter vault installations in Illinois or Indiana in the last 10 years with a minimum contract price of $150,000.

Award

Water / Sewer

$79,036.00

Public - City

Site Work

5

12

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
90
Bidding Soon
1,751
All Active Projects
777
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2023

October 6, 2023

img_map_placeholder

183rd St & Ridgeland Ave, Tinley Park, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.