BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Saginaw, Michigan. Completed plans call for the renovation of a municipal facility.

**As of September 12 2023, the project has been awarded but award amount was not confirmed.** Project specification All work must comply with applicable codes and acceptable standards ofworkmanship. Individualjob specifications, hearer notes, or specific materials or methodology instructions shall take precedence. The city reserves the right to alter specifications tofitparticular situations. Roof Shingles, Fascia, Soffit and Gutter replacement package: Remove the old roof shingles down to the existing sheathing. Also remove any other necessary building components to properly complete the project. Properly dispose of all the debris away from the site. Install all new 30 year warranty architectural dimensional type roof shingles. Include all new 7/16" OSB roof sheathing. Install proper underlayment with ice & water shield in all required areas. Include all new drip edge, roof venting and any required flashing components. If proper soffit venting is not easily obtainable you may install an edge / intake roof vent (Smart Vent) system. Any low slope roof areas shall be a TPO type system or equivalent. Include any required sheathing, flashings, corners, pipe boots & termination bars. If the existing chimney is in need of repair include a chimney repair cost noted on your invoice / bid sheet. Install all new aluminum soffit panels with a 1 to 1 ratio of solid and vented panels. Install all new aluminum fascia and rake boards. Include a new seamless aluminum gutter system with all new downspouts and proper extensions. The property owner shall be allowed to pick from all stock available colors. All work must be installed per the manufacturer's specifications and directions. The contractor must obtain a permit and have the work properly inspected and approved prior to payment. Upon completion the contractor shall also provide any required project photos and all warranty information prior to receiving payment. See the items circled and noted below for further project information.

Award

Municipal

$350,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
72
Bidding Soon
992
All Active Projects
432
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2023

September 4, 2023

img_map_placeholder

To Be Determined, Saginaw, MI


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.