BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Avon, New York. Completed plans call for site work for a water / sewer project.

Construction, installation, and setting-to-work of an external stand-alone gravity-flow ultraviolet (UV) disinfection system. Work under this Section shall consist of the testing of concrete wetwells, tanks, channels and any other concrete liquid holding structures located at the project site. These Specifications are intended to provide assurance of watertight structures. Contractor shall coordinate and pay all costs associated with testing requirements, including, but not limited to: pumping equipment, gauges, valves, plugs and supports. The Owner will make available the water necessary for testing from existing systems at cost to Contractor. The Contractor shall provide the means of filling the structure which is acceptable to Engineer/Owner. Sources of water other than potable water shall be submitted to Engineer/Owner for acceptance. Water payment shall be made to the municipality providing the water at their current water rate. Contractor shall provide Engineer/Owner written notice to commence testing procedures. Engineer/Owner and Contractor will conduct pre-test inspection of structures. Contractor shall promptly repair any surfaces showing signs of honeycombing, cracks, tie wire holes or stone pockets as required per section 03 30 00 General - upgrade to the wastewater treatment plant including but not limited to, the following: Construction of a new UV Disinfection tank and pole barn cover. Work includes general site construction, concrete/masonry tankage and building construction, equipment installation and process/site piping, bypass piping, bypass pumping and valves, grading and restoration. Work includes minor HVAC components of fan and louver. - Electrical - site work, trenching, upgrades and modifications to panels, wiring, conduit, fixtures, devices, connections to UV Equipment, motors, controls, lighting, terminations, new control wiring and panels. Wiring to fan and louver. Generator and automatic transfer switch work work and primary service installation for UV building, along with facilitation and furnishment of 3rd party inspection to satisfy utility requirements for new service. - Note bid alternates on the project Mark Bailey mbailey@mrbgroup.com Matt McKenna (August 1st through August 15th) Matthew.McKenna@mrbgroup.com

Award

Water / Sewer

$1,190,611.00

Public - City

Site Work

28

32

9

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
161
Active Projects
68
Bidding Soon
1,211
All Active Projects
637
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 16, 2023

October 16, 2023

img_map_placeholder

11 Farmers Rd, Avon, NY


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.