BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 23, 2023 at 8:00 PM

Updated November 15, 2023

Site work for a water / sewer project in Seattle, Washington. Completed plans call for site work for a water / sewer project.

Removal of the existing vehicle transfer span associated cable lifting frame and support piling, installation of new hydraulic transfer span and apron, drilled shaft foundations and replacing the end batter pile located on the left wingwall and modification to the bridge seat and other work. Involves 39 items and 150 working days. Work class 6 or 43. County King County Estimated value Over $10,000,000 A state funded contract with a 5% condition of award small business enterprise goal and a 3% condition of award veteran-owned business goal. Carl Vogt Project Engineer Carl.Vogt@wsdot.wa.gov 206-515-3723 WADOT - SR 519, Seattle Ferry Terminal Slip 3 VTS Replacement

Award

Water / Sewer

$13,265,581.00

Public - State/Provincial

Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
202
Active Projects
113
Bidding Soon
1,772
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 7, 2023

July 8, 2024

Project location map

SR 519, Seattle, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.