BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 19, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Fairfield, Illinois. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of September 19, 2023, bids received were rejected as they were over the budget. Project will be rebid but no definite date yet.** City/County Fairfield 1 LS TCP (Special) 0.06 ACRE Seeding, Class 1 (Special) 31 CY Earth Excavation 2561 SF PCC Sidewalk 4" 20 SF Detectable Warnings 12 LF Pipe Drains 8" 12 LF Pipe Drains 12" 36 LF Paint Pavement Marking - Line 12" 17 SF Paint Pavement Marking Letters and Symbols 6 SF Sign Panels, Type 1 26 LF Metal Posts, Type A Project Location: : Industrial Drive Proposals Requiring Prequalification of Bidders Will Be Issued Only to Those Contractors Who Are Qualified With the Department of Transportation. Prequalification Forms May Be Secured From the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, Il 62764. IL DOT - Pcc Sidewalk, Pipe Drains, Paint Pavement Marking - 23-00062-00-SW

Final Planning

Sidewalks / Parking Lot

$500,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
67
Bidding Soon
726
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2023

March 19, 2024

Project location map

Industrial Dr, Fairfield, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.