BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Hazard, Kentucky. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The proposed project (approximately 2.1 acres, the waste area is approximately 18.0 acres, though only a small fraction will be used) consists primarily of installing a pile and lagging retaining wall to stabilize the hillside below the Cornett residence. The project area is located at N 37 02' 46.38", W 83 08' 45.79". The site address is 212 Clover Fork Road and is located off KY-699 in Leatherwood, KY 41731. The primary waste area is located approximately 2.2 miles from the project site at N 37 02' 22.3", W 83 10' 29.3". Reclamation work consists of constructing a pile and lagging retaining wall in the northwest hillside below the Cornett residence. The steel piles will be W14x68 and conform to the "Steel" AML Technical Specification. Concrete Formed and finished is included to construct a foundation of the concrete lagging panels. Concrete Non-Formed and Finished is included to seat steel piles. Soil and Rock drilling (36") is included to set steel piles. Filter Fabric is included to secure the retaining wall once installed, and No. 2 Stone and Class II backfill are included to stabilize the hillside and allow for drainage behind the wall. Retaining Wall Subdrain also is included to deal with drainage behind the wall. A row of rail steel with guardrail lagging will be installed on the northwest side of the residence to maintain hillside integrity during construction of the pile and lagging wall, and another row of rail steel and lagging will be installed downhill from the wall. This is done to create a stable bench from which the drill rig can operate for the construction of the wall. More Concrete Non-Formed and Finished is included to seat the rail steel, and Soil and Rock Drilling (15") is included to set rail steel. Any material relocated due to these construction efforts will be paid for under the "Earthwork" bid item. Some trees near the state road KY-699 may need to be removed to allow equipment to access the project site, and if deemed necessary by the ENGINEER, this will be paid for by the "Site Preparation" bid item. Hay bales/silt fence will be used for sediment and erosion control. Bridge cribbing is included for the existing bridge into Clover Fork Road. Site Preparation is included to allow for any preparation of land which will be disturbed by the project. Hoe Ram is included in case it is needed to create the bench where the retaining wall will be constructed. Bituminous Repair is included to repair "in kind" any existing Bituminous damaged by normal construction activities to Clover Fork Road. Dense Grade Aggregate and Roadway Stone are also included to repair damage done to Clover Fork Road. Driving directions: From the Hazard field office, turn right and stay on KY-15 S for 4.9 miles, then turn right onto KY-7 N. After 11.0 miles, turn right onto State Highway 699. After 9.1 miles, turn left onto Clover Fork Road. Travel approximately 0.2 miles, staying to the right, and the Cornett residence will be at the end of the road. To reach the waste area, return to State Highway 699 and turn left. In approximately 2.0 miles the waste area will be on your right. All disturbed area will be revegetated using the bid items as setup in the contract. No trees 3-inch in breast height will be disturbed the period of March through October, except for the slide and transition area.

Bid Results

Roads / Highways

$1,284,475.00

Public - County

Paving, Site Work

8

6

7

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
84
Bidding Soon
783
All Active Projects
378
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 23, 2023

September 10, 2023

September 9, 2024

img_map_placeholder

101 Bulldog Ln, Hazard, KY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.