BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a residential development in Hazard, Kentucky. Completed plans call for the renovation of a residential development; and for site work for a residential development.

W.B. Hollow Projects HP AMLRP (AML Reclamation Project This project is located in Letcher County near the community of Kona KY, to reach the sites from the Intersection of US Hwy 119 and KY Hwy 805, turn left onto Hwy 805 travel 0.52 miles to the intersection of Hwy 113 and Hwy 805, turn right and continue on Hwy 805 for 2.80 miles to W.B. Hollow Road, turn right onto W.B Hollow road and travel 0.05 miles to first site on right of road. Continue 0.12 miles to second site on right of road. Holbrook Site-37.1790 N -82.7086 W Davis Site-37.1778 N -82.7062 W The Davis Site will consist of a 232 Long 12' to 8' Reinforced Concrete Wall which will stabilize the slope above the Davis Residence, and stabilize the residential area above this wall. Upon completion of the Reinforced Concrete Retaining wall and installation of subdrain Class II aggregate and filter fabric will be installed behind the wall. The construction of a 64 LF debris barrier wall to protect the residence during the construction of concrete wall. The replacement of a 24" pipe with sloped and flared headwalls will also be done. Excavation of slide area northeast of residence and backfill with Class II/II rock will also be implemented. The Holbrook Site with consist of the construction of an 80' long 6' high Non-Reinforced Block Wall. The replacement of 140 LF 36" HDPE pipe. The excavation of 3 slide area and backfilling with Class II/III rock. Silt Checks-Rock will be installed as needed by Scientist on site at appropriate locations. Mobilization is setup to provide for construction equipment to be delivered to the site. Earthwork work bid item is included to excavate material to seat wall and at other areas as directed by the ENGIEER. Material will be transported to an off-site waste area. A hoe ram bid item is setup to address/reduce the size of boulders too large to move with an excavator. Subdrains are included to remove subsurface drainage from behind retaining walls, and other areas to enhance long term stability. Utility Relocation, Structure Removal/Replacement and Landscape Allowance are setup to address these features that may require location / replacement to facilitate normal reclamation activities. Site Prep is included, at both the sites and waste area to prep the areas for reclamation and material storage. Seeding, Seedbed Prep, Fertilizer, Mulch-Straw & Hay and Residential Seeding are included for all reveg efforts within the site and waste area. Dense Grade and Roadway Stone are included to provide for access during normal reclamation. Bituminous Repair is included to repair "in kind" all asphalt surfaces damage due to normal reclamation activities. Waste Area: This offsite waste area is located on a previously disturbed enhancement project mined area. To access is from the site, from Intersection of KY Hwy 805 and W.B. Hollow Road continue east on Hwy 805 approximately 1.93 miles to Ramey Fork Road, turn right on Ramey Fork Road travel 0.37 miles to access road on left, travel access road 0.1 miles to waste area. The coordinates are 37.1726 N -82.6786 W. Any permits will be obtained prior to construction. No trees 3" diameter or more at breast height will be disturbed, no cave-like structures will be closed, and no cliff-lines will be disturbed. There is only invasive species like Autumn Olive on this site.

Bid Results

Residential Subdivision

$1,233,920.00

Public - County

Renovation, Site Work

8

7

9

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
19
Bidding Soon
429
All Active Projects
193
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 24, 2023

September 1, 2023

img_map_placeholder

101 Bulldog Ln, Hazard, KY

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.