Demolition, site work, renovation and addition to an educational facility in Ringgold, Georgia. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

**As of September 13 ,2023 project was awarded to EMJ Metals but awarded amount is not available.** The project consists of a classroom addition and related support spaces. The Catoosa County School System (CCSS) desires to retain the services of a professional Construction Management (CM) firm for the management, under a construction management/contractor format, for the construction of an addition to Boynton Elementary School.. To qualify for consideration, a firm must be prepared to provide the expertise, resources and personnel experience in project planning, cost management, project control, preconstruction and construction techniques, value-engineering analysis, scheduling and quality assurance throughout the planning and construction phases of the project. The services to be performed by the CM will have as their objective the efficient, economical, and timely delivery of the project by managing the construction of the project within the time and cost limitations and within established quality requirements. The services will be performed during the pre-construction phase and construction phase including working with owner and architect in project planning, arrangement of bid packages, bidding and award of the trade contracts and management of construction until occupancy is achieved. The project consists of a classroom addition and related support spaces. In issuing the RFQCM, it is the intent of CCSS that the successful CM will provide a Guaranteed Maximum Price (GMP) for the cost of the construction of the project to include a Guaranteed Delivery Date (GDD). CCSS also intends that the successful CM accept the following stipulations: 1. Provide Performance and Material and Labor Payment Bonds in the amount of 100% of the GMP. 2. Individual Trade Contracts will be between the CM and the Trade Contractors, subject to CCSS approval. 3. The CM will not perform any portion of the project with its own forces except as may be mutually agreed to by the owner and the CM. 4. The CM will be "at risk" in the proposed undertaking and will be responsible for completing the project within the GMP. 5. Should the final cost of the project be less than the GMP, savings shall be shared equally between CCSS and the CM. 6. An agreed percentage of pay applications will be held in retention. 7. CCSS shall have the authority to suspend or terminate performance of the project. 8. Construction Manager will share with CCSS the calculations and assumptions on which the CM's proposed GMP is based. Project Schedule has several milestone dates: o CM Selection September 2023 o Ground Breaking December 2023 o Substantial Completion July 2024 o Classes Begin August 2024 Due to the evaluation process, proposals must remain in effect for at least 60 (Sixty) days after date of receipt. Questions concerning the RFQC shall be emailed to Mr. Ray Boaz at rboaz@dhwarchitects.com .

Award

Educational

$15,000,000.00

Public - County

Addition, Demolition, Renovation, Site Work

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
243
Active Projects
142
Bidding Soon
1,709
All Active Projects
789
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 24, 2023

December 25, 2023

July 31, 2024

img_map_placeholder

3938 Boynton Dr, Ringgold, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.