BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Holly Springs, North Carolina. Conceptual plans call for site work for a water / sewer project.

The Town receives water from Harnett County which allows 10 MGD; due to hydraulic limitations, the existing pumps and pipeline only deliver up to 5 MGD. Holly Springs is partnering with Harnett County to obtain a site, design, and construct an intermediate booster pump station (BPS) and elevated storage tank. The Preliminary Engineering Report was completed in August 2023. The recommendation is to build an intermediate storage and BPS near Christian Light Road and NC 401 consisting of three 12 MGD pumps and 1.0 million gallon elevated stroage tank. Improvements to the existing Wake County Pump Station at Fleming Road are also required for Harnett County to transfer 10 MGD into the Holly Springs Distribution System. As of December 10, 2024, this project is included in the Town of Holly Springs' Fiscal Year 2024-2029 CIP. Further information regarding a design firm and timeline for construction has not yet been established. Funding is allotted for FY 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$16,200,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
131
Active Projects
54
Bidding Soon
1,147
All Active Projects
417
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

img_map_placeholder

To Be Determined, Holly Springs, NC

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.