BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Akron, Ohio. Completed plans call for site work for a water / sewer project.

This project consists of the replacement of one (1) high service pump and one (1) low service pump with two (2) new high service pumps and all new piping inside the station. Project also includes architectural and structural improvements, replacement of electrical transformer to pole mounted transformer, electrical upgrade, new natural gas heater, LED lighting fixtures, bathroom, and backup generator. Site improvements include new drive/parking and two (2) new fire hydrants with gravel access drive. Plans are in accordance with the City of Akron, Construction and Material Specifications, 2008 Edition and with the City's standard construction drawings, unless otherwise noted in the plans or the bid book. Hard copies of these specifications and drawings may be purchased at SE Blueprint as listed above. Purchases are not refundable. These documents are also available at no charge on the City of Akron Electronically. EPA Goals: 1.3% MBE and 1.0% WBE City of Akron Local Goal: 18% EDGE/DBE/MBE/WBE/SBE/VBE (minimum 3% WBE) Disadvantaged Business (DBE) participation goals (subcontracts, materials, supplies) have been set on this Project for those certified as DBE's in accordance with a federal agency such as the Small Business Administration or the Department of Transportation or by an approved State of Ohio agency. The Unified Certification Program (UCP) administered by the Ohio Department of Transportation (ODOT) can provide necessary DBE certifications. This procurement is subject to the Environmental Protection Agency (EPA) policy of encouraging the participation of small businesses in rural areas (SBRAs). For the purpose of this Project, the Minority Business Enterprise (MBE) Utilization goals shall be defined as contractors and/or subcontractors with MBE's for the minimum amount of 1.3% of the Contract Price; and the Women's Business Enterprise (WBE) Utilization goals shall be defined as contractors and/or subcontractors with WBE's for the minimum amount of 1.0% of the Contract Price. The City of Akron is committed to ensuring that individuals with disabilities are able to fully participate in public programs, services, and activities. Anyone who is in need of an accommodation from any City department is invited to contact Yamini Adkins, Director of Human Resources, 166 South High Street, Municipal Building, Suite 103, Akron, Ohio 44308, (voice) 330-375-2780 as soon as possible. If you require TDD phone service call Ohio Relay at 800-750-0750 and they will assist in contacting the Department of Human Resources at (330) 375-2780. All contractors and subcontractors involved with the project will, to the extent practicable, use Ohio products, materials, services, and labor in the implementation of their project. Domestic steel use requirements as specified in Section 153.011 of the Ohio Revised Code apply to this Project. Copies of Section 153.011 of the Ohio Revised Code can be obtained from the Ohio Department of Administrative Services. Except as provided in Section 102.07 of the City of Akron, Construction and Materials Specifications, 2008 Edition, each proposal must be accompanied by a certified check in the sum of 10% of bids on a solvent bank, or a bid bond in like amount, acceptable to the City of Akron, as a guarantee, that if the proposal is accepted, a contract will be entered into. Proposals may be held by City for a period not to exceed one hundred twenty (120) days after the date Proposals are opened for the purpose of reviewing the Proposals and investigating the qualifications of Proposers prior to awarding the Agreement. Except as provided in Section 34.09 of the City's Code of Ordinance, the Proposer to whom the Agreement is awarded will be required to furnish a performance and payment bond in the sum of 100% of the Contract Price for the faithful performance of the contract. The performance and payment bond shall remain in full effect until Final Completion of the Project. The Director of Public Service reserves the right to reject any or all bids, and to waive informalities. Bidders must use the prepared forms provided therefore which include compliance with Section 34.03 of the Codified Ordinances of the City of Akron, Ohio regarding public contracts. Additionally, contractor compliance with the equal employment opportunity requirements of Ohio Administrative Code Chapter 123, the Governor's Executive Order of 1972, and Governor's Executive Order 84-9 shall be required Valuation: 1 - 5 Million Question Deadline: September 26 by 11:00 AM Responsces to Questions: September 28 by 11:00 AM

Bid Results

Water / Sewer

$1,619,000.00

Public - City

Site Work

53

24

5

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
62
Bidding Soon
1,005
All Active Projects
398
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 4, 2023

November 13, 2023

img_map_placeholder

1258 E Archwood Ave, Akron, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.