BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Stanwood, Washington. Conceptual plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; and road / highway.

The Twin City Mile revitalization project reimagines how the City`s main downtown commercial corridor, 271st and 270th Streets, could look and function by connecting City Hall Park to the Train Station. Project elements include constructing gateways, reconfiguring travel lanes and parking, building wider sidewalks and plaza areas, constructing park areas, and installing street trees, art, and other curb appeal amenities. Using policy guidance from the City Beautification Plan, the City initiated the Downtown Revitalization Project that invests in the downtown business district infrastructure by: Creating Pedestrian-Friendly Streets; Actively Engage Storefronts with Walkable Sidewalks; Encourage Use of Streets for Community Festivals; Create Usable Urban Park Spaces; and Promote the Concept of Buying Local. Over the next six years, the project will be broken into multiple phases as follows: 2023: West End Brick Road 10% Design, 92nd Avenue Design and Construction, 92nd Avenue Lighting, 88th Avenue Lighting Design, East End Concept Designs and Traffic Calming, 88th Avenue Arch, West End Gateway 2024: Camano Street Design, 88th Avenue Power & Lighting Construction, East End Traffic Calming Improvements 2025: Camano Street Construction 2026/2027: West End Brick Road 100% Design and Permitting 2028: West End Brick Road Construction This project is included in the City of Stanwood's FY 2023-2024 Capital Improvement Program (CIP) As of August 9, 2023, information regarding a design team or a general contractor is not available. Construction is anticipated from 2023 to 2028.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$10,137,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
41
Bidding Soon
1,775
All Active Projects
722
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.