BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Newington, Connecticut. Completed plans call for site work for a road / highway.

Project Scope Code: G If a question needs to be asked the day before the bid date, please contact the Contracts Unit staff and email your question to dotcontracts@ct.gov immediately. G: $ 5,000,000 $ 7,499,999 State Project Number(s) & Description: State Project No. 172-501; Installation and Revision of Traffic Control Signals in various towns in District 2 Required Prequalification Work Classification(s): 13 - Traffic Control and Illumination/Electrical Federal-aid Project Number(s) & Funding Source: Federal FHWA (F.A.P. No. 000T(365)) Pre-Bid Conference and/or Site Visit Information: N/A District Number(s): 2 - Norwich Contract DBE % Goal or SBE % Set-Aside: 6% DBE All bidders DBE Commitment Approval Request form(s) meeting the established DBE contract goal percentage or Good Faith Effort (GFE) Application Request including all backup documentation, as applicable, are due to the Department no later than five (5) calendar days after the bid opening. Please send DBE submittals to dotbid@ct.gov. In the subject line of your email please include the project number and DBE Submittal. It is highly recommended that all bidders complete the required documentation during their bid preparation process in order to meet the DBE submittal requirement. If not received on time your bid may be rejected as provided by Section XI of the Construction Contract Bidding and Award Manual. SBE Submittal Requirements - The low bidders SBE Commitment Approval Request form(s) meeting the established SBE set-aside percentage or Request for Waiver application are due to the Department no later than five (5) calendar days after the bid opening. It is highly recommended that all bidders complete the required documentation during their bid preparation process in order to meet the SBE submittal requirement. If not received on time your bid may be rejected as provided by Section XI of the Construction Contract Bidding and Award Manual. A list of bid items and quantities is attached. This list is NOT the official bid proposal form. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$5,768,972.00

Public - State/Provincial

Site Work

104

5

9

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
500
Active Projects
210
Bidding Soon
4,604
All Active Projects
1,936
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 23, 2023

October 23, 2023

img_map_placeholder

Multiple Locations, Newington, CT


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.