BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Fort Wayne, Indiana. Conceptual plans call for site work for a playground / park / athletic field.

The City of Fort Wayne Parks and Recreation Department (FWPRD) is seeking proposals with fees from firms qualified to prepare Construction Documents and Specifications, including Construction Administration for the Redevelopment of Packard Park. Packard Park, in Context Packard Park (427 Kinsmoor Avenue, Ft. Wayne, IN 46807) is located in south central Fort Wayne in the heart of the '07 neighborhood, bordered by Fairfield Avenue to the west, Packard Avenue to the north, Hoagland Avenue to the east, and Kinsmoor Avenue to the south. It is situated in a residential neighborhood within blocks of several churches, two elementary schools, one high school, and a number of commercial businesses. The Board of Park Commissioners purchased the land which is now known as Packard Park in 1933; the space was previously occupied by the Packard Piano Company. At 4.5 acres, the park is currently home to a hybrid open-air/enclosed pavilion, playground, softball field, futsal courts, and open space. In 2019, neighborhood residents contacted FWPRD to discuss improvements to the park. Park planning staff engaged with the neighborhood leaders, forming a steering committee made up of residents and area leaders. The steering committee set the goals, or guiding principles for the park redevelopment. Park staff then worked with the steering committee to plan and execute a series of public input meetings. A survey was also prepared and distributed both in person and online. The results of that public input effort were tested against the guiding principles and a plan was drafted by Fort Wayne Parks' landscape architect. Additional feedback was received for that draft plan and in November 2020, the final Packard Park Master Plan was adopted by the Board of Park Commissioners. FWPRD is now prepared to bring onboard a design firm to develop construction documents for plan implementation.

Conceptual

Playgrounds / Parks / Athletic Fields

$320,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
59
Bidding Soon
582
All Active Projects
300
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2023

October 2, 2023

img_map_placeholder

427 Kinsmoor Ave, Fort Wayne, IN


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.