BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a municipal facility in Royal Palm Beach, Florida. Completed plans call for the renovation of a municipal facility.

Architect/Engineer of Record: Not Applicable Question Deadline 08/10/2023 General Description of the Project: To replace two (2) HVAC in the Re-Pump Electrical Room All conditions and requirements for Quote/Bid submission, consideration, and award including S/M/WBE requirements and bonding requirements are contained in the Qualification of Contractors. Qualification is required in order to bid for projects under this Annual Contract. A contractor may obtain a Qualification Application for this Annual Contract by sending an email with the Project # Prequalification: Annual Contract - HVAC in the subject line to: FDO-CIDBids@pbcgov.org or call (561) 233-0261. Qualification applications may also be obtained Electronically The contractor must submit the Qualification Application at least 10 calendar days before the Quote/Bid Due Date in order for its quote/bid to be considered. Palm Beach County reserves the right to waive any bid irregularities, informalities, or technical deficiencies and to reject any and all quotes/bids SCOPE OF WORK To replace two (2) HVAC in the Re-Pump Electrical Room per the project requirements provided below: a. Remove existing Condensing Units (CU) and Air Handler units (AHU), furnish and install a new HVAC equipment as specified in Exhibit "1" and this scope of work Demolition shall be one (1) unit at a time and coordinated with Water Utilities Department (WUD). c. One new unit shall be operational minimum forty-eight (48) hours with no issues before the second unit is demolished. A complete start-up sheet shall be provided and approved prior to the second unit shutdown. The contractor shall document the system pressures and running load amps. d. The removed units shall be disposed of according to local guidelines. e. Test, remove, reinstall, and re-test the fire alarm devices per Electronic Services & Security (ESS) specifications in Exhibit "2". All testing shall be completed with an ESS representative present. f. Replace the existing electrical connectors, liquid-tite conduit, and wire from the exterior disconnect to the new condenser unit. Existing disconnects shall remain and be reused. g. Provide all necessary piping, electrical, control wiring accessories, and refrigerant lines to make the system operational per the manufacturer's specifications. h. All Air Handler & Condenser Unit coils shall be coated with Luvata Insitu Coil Coating or Palm Beach County (PBC) approved equal. i. Include and install factory hail guards for both condenser units. j. Contractor shall use new 410A refrigerant, check for proper charge, and leak check refrigerant system. k. Contractor shall confirm all refrigerant line sizes for new 410A equipment. l. The Contractor shall include new line sets if existing is not compatible with new equipment. Existing line set supports and hangers can be re-used and modified to accept the new line sets. All new copper shall be Hard-Drawn Type K copper. m. If re-using the line sets, the contractor shall remove all R-22 Refrigerant and flush all refrigerant lines to accommodate the new R-410A Refrigerant. n. Install new liquid and suction line driers, with shell cores. Manufacturer installed driers shall be removed onsite prior to charging the system. All new copper pipe fittings shall be Hard-Drawn Type K. o. Perform a 30-in mercury evacuation of refrigerant lines by use of a vacuum pump and maintain a 30-in mercury standing vacuum for one (1) hour after new filter cores are installed. p. Pipe Insulation shall be Aero flex Ethylene Propylene Diene Monomer (EPDM) rubber or PBC approved equalInstall new liquid and suction line isolation valves, before and after drier cores, to accommodate core removal. r. Install new Stainless Steelpan and safety float switches at each Air Handler Unit. s. Install liquid line sight glasses on both stages t. Ensure all drain lines are clear and operational. u. All new penetrations shall be sealed and patched to meet code requirements. v. Document system pressures and running load amps. w. Where insulation is exposed outside, it shall be painted with two coats of paint, containing Ultra Violet (UV) inhibitors, and in accordance with the insulation manufacturers' recommendations. x. Provide and install new matching programmable thermostats as per Trane's specifications. y. New equipment and existing disconnects shall be identified with new number labels 1. For example: AHU 1/ AHU 2, CU1/ CU 2 2. Numbering shall be plastic engraved plates adhered to each unit in a visible spot. z. Electrical Panel Legend shall be updated to match the installation.

Award

Municipal

$97,953.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
59
Bidding Soon
1,161
All Active Projects
489
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 31, 2023

October 2, 2023

img_map_placeholder

12500 40th St N, Royal Palm Beach, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.