BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in El Paso, Texas. Completed plans call for site work for a water / sewer project.

Engineer Estimate: $$5,679,654.75 - $$6,468,495.69 Questions Deadline: August 1, 2023 by COB Questions can be sent to: purchasing.info@epwater.org *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The work under this contract shall be for furnishing all labor, materials, transportation, and services for the construction and installation of the following work: Shall include, but is not limited to approximately 20 lineal feet of 21-inch sanitary sewer pipe; 5,340 lineal feet of 24-inch sanitary sewer pipe; Approximately 1,840 lineal feet of 27-inch sanitary sewer pipe; Approximately 1,540 lineal feet of 30-inch sanitary sewer pipe; Approximately 60 lineal feet of 8- inch sanitary sewer pipe; twelve 72-inch diameter manholes; one 72-inch diameter drop manhole; Approximately 170 lineal feet of extra depth for manholes; Approximately 7,166 cubic yards of excavation (cut to export); Approximately 279 cubic yards of excavation (cut to fill); Approximately 8,740 lineal feet of trench excavation protection; Approximately 6,250 lineal feet of removal and replacement of farm fence; Approximately 8,640 lineal feet of 16-inch water pipe; Approximately 30 lineal feet of 24-inch water pipe; Approximately 20 lineal feet of 8-inch water pipe; Approximately seventeen 16-inch gate valves with manhole and bonnet box, one 8-inch gate valve with bonnet box; three blow-off valves with manhole; three 2-inch combination valves with manholes; Approximately 10,971 cubic yards of excavation (cut to export); Approximately 275 cubic yards of excavation (cut to fill); Approximately 8,670 lineal feet of trench excavation protection; corrosion protection system; videotaping of project site before and after construction; and a traffic control plan. Wages paid on this project shall be not less than the minimum prevailing wage rates listed in the Contract Documents, Section 00840, General Wage Requirements

Post-Bid

Water / Sewer

$6,468,495.00

Public - City

Site Work

72

24

14

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
7
Bidding Soon
248
All Active Projects
110
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2023

October 16, 2023

img_map_placeholder

To Be Determined, El Paso, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.