BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a sidewalk / parking lot in Binghamton, New York. Completed plans call for the renovation of a sidewalk / parking lot.

Broome DDSO is seeking a contractor to install new concrete sidewalk at Diane Dr. The new walkway must be accessible and constructed out of concrete. The successful bidder shall provide all labor and materials necessary to complete the work in a professional manner according to below scope of work and general requirements. A site visit required. Details regarding setting up the site visit are listed after the scope of work and general requirements listed below. Scope of work includes, but is not necessarily limited to the following: 1. Location of sidewalk project in picture below marked in Red. 2. Remove old sidewalk and properly dispose of all materials. Saw cut sidewalk that the new is adjacent to. 3. Install and properly compact 6" of gravel subbase underneath all areas where new walk is to go. Gravel shall be placed in 3" lifts and compacted between each lift. Gravel shall be washed #2 stone. Area prepared shall support a concrete walkway 4' wide going from driveway to existing sidewalk. 4. Properly install concrete walkway in area that was excavated. Concrete walkway shall be composed of 6" of 4500 PSI concrete. Walkway shall be reinforced with welded wire mesh (6" x 6", #10 x #10). Wire mesh shall be supported during concrete pour to be located midway in the pad. Air shall be entrained in the concrete to no less than 4% of the volume of the total pour and no more than 8%. Walkway should be 4' wide going from driveway to existing sidewalk. 5. Walkway shall have proper control joints placed not more than 5' apart, it shall have an expansion joint where it meets existing sidewalk. 6. Walkway shall have a broom finish or other facility approved non-slip finish. 7. Walkway shall be sealed with a penetrating sealer as soon as allowed by manufacture directions. Sealer shall be approved by facility personal and shall be rated to protect the concrete from the effects of ice melt. 8. Ground shall be sloped away from walkway for at least 36" on either side unless obstructed by a structure. Walkway shall be no more than 2" above ground on either side. Ground shall be left in a smooth rock free and tamped state, but contractor shall be excused seeding due to the lateness in the season. 9. Contractor shall be responsible for providing coverings, additives, or anything else necessary to get walkway to properly cure in inclement weather. Contractor shall not be excused from meeting project deadlines due to weather. 10. Sidewalk shall be fenced off with construction fencing when it is left to cure. 11. All work done shall comply with NYS Building Code and all other applicable codes. 12. All construction related debris are the contractor's responsibility to removed and dispose of properly. Service-Disabled Veteran-Owned Set Aside: No The Broome DDSO reserves the right to reject any and all quotes. In deciding whether to submit a quote, please be aware the awarded vendor must adhere to time frames outlined in the scope of work.

Award

Sidewalks / Parking Lot

$50,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
64
Bidding Soon
845
All Active Projects
429
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2023

September 29, 2023

img_map_placeholder

17 Diane Dr, Binghamton, NY

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.