Site work for a water / sewer project in Powellton, West Virginia. Completed plans call for site work for a water / sewer project.
Furnishing all materials, labor, and necessary items for the construction and installation of the 137,000-gallon water storage tank, valve vault, telemetry, pile and lagging retaining walls, fencing, site access road, decommissioning the existing tank, connection to the existing system, and all the related appurtenances All bid must be accompanied by a Bid Guarantee Bond payable to the Owner for five percent (5%) of the total amount of the Bid or a Certified Check, Cashier's Check, or Letter of Credit in the amount of not less than five percent (5%) of the Bid. Contractors are required to comply with all laws pertaining to the federal wage rates issued in accordance with the Davis Bacon Act. Each Bidder must fully Comply with the Disadvantaged Business Enterprises, and Affirmative Action Requirements, as identified in the contract documents. The Bidder agrees to make "positive efforts" to subcontract a portion of the total value of the contract to Disadvantaged Business Enterprises. This shall be done in compliance with the six (6) affirmative steps as outlined in 40 CFR 33.240. Failure to demonstrate positive efforts to do so may lead to rejection of bids. For this program, the term "subcontract" includes all construction, modification, and service work contracted for by the bidder in the execution of the work under this contract. Pursuant to West Virginia Code 5-22-2, requirements stated in the advertisement for bids and the bid form may not be waived by any public entity. All bidders are required to have a West Virginia contractor's license per Section 21-11-11 of the West Virginia Code. A Contractor's License Number is to be included on the bid submission. Contract Times for Contract: 120 calendar days to substantial completion and 150 calendar days to complete work ready for final payment. Contractor shall pay Owner $1,000 for each day that expires after the time (as duly adjusted pursuant to the Contract) for Substantial Completion until the Work is substantially complete. The Owner reserves the right to reject any and all bids. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. All questions shall be submitted via email to: Kenneth W. Kinder, P.E. (Project Manager) kkinder@elrobinson.com Question Deadline 08/25/2023 at 3:00 PM ET
Bid Results
Water / Sewer
$2,091,082.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
September 5, 2023
October 5, 2023
March 3, 2024
To Be Determined, Powellton, WV
Related To This Project
Martinsburg, WV
Bid Date: Jun 11 2019
Ghent, WV
Bid Date: Jul 08 2021
Clarksburg, WV
Bid Date: Aug 09 2023
Weirton, WV
Bid Date: Aug 07 2023
Weirton, WV
Bid Date: Aug 22 2023
Ona, WV
Bid Date: Oct 17 2023
Kingwood, WV
Bid Date: Aug 14 2023
Logan, WV
Bid Date: Aug 04 2023
Charleston, WV
--
Charleston, WV
Bid Date: Sep 05 2023
Morgantown, WV
--
Welch, WV
Bid Date: Aug 09 2023
Charleston, WV
Bid Date: Aug 15 2023
Morgantown, WV
Bid Date: Aug 03 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--