BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Whittier, California. Completed plans call for site work for a water / sewer project.

The project will rehabilitate approximately 15,392 feet of existing corroded 10- to 18-inch diameter non-reinforced concrete pipe (NRCP) with cured-in-place pipe liner and approximately 52 manholes with a protective coating system on the Compton Avenue Trunk Sewer and Nadeau Trunk Sewer Sections 1 & 2. The project locations are in the unincorporated areas of Los Angeles County. The work of construction must be completed within 260 WORKING DAYS after the date in the Notice to Proceed. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The District encourages participation in its construction contracting by all members of the community including Minority Business Enterprises (MBE), Women Business Enterprises (WBE), Disadvantaged Business Enterprises (DBE), Disabled Veterans Business Enterprises (DVBE) and Small Business Enterprises (SBE). The District has established an aspirational goal of 20% overall participation by such firms. Although such participation is encouraged, award of a contract is not based on race, gender, disabled, disadvantaged or small business status

Award

Water / Sewer

$3,749,240.00

Public - County

Site Work

39

8

2

6

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
210
Active Projects
122
Bidding Soon
2,243
All Active Projects
1,061
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 7, 2023

November 9, 2023

img_map_placeholder

1955 Workman Mill Rd, Whittier, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.