BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a transportation facility in Los Angeles, California. Conceptual plans call for site work for a transportation facility.

2.1 Project A - Terminal Island Rail System Grade Separation The proposed Terminal Island Rail System Grade Separation (TIGS) entails the following: • A new four-lane grade separated roadway that shall span three (3) existing Port of Los Angeles (POLA) mainline tracks, linking the intersection of Ferry Street and Terminal Way to the Terminal Island Maritime Support Facility (TIMSF). Attachment 1, a site map showing both the TIGS project and TIMSF project, provides a visual representation of the proposed construction. The new grade separation is currently envisioned to be constructed on fill material, retaining walls, and abutments, featuring a precast girder bridge. Attachment 2 provides one (1) conceptual plan view drawing of a proposed layout for the grade separation. Attachment 3 provides a profile view of the conceptual grade separation plan referenced in Attachment 2. • Modifications to the intersection of Ferry Street and Terminal Way to provide access to the new grade separated roadway; including the installation of a new and/or modified traffic signal. • A new westbound (WB) on-ramp from Terminal Way to the new grade separated roadway, between the intersection of Ferry Street and Terminal Way and the existing Terminal Way grade separation. This grade separation will provide access to the TIMSF which is located at the former LAXT 80-acre site and is enclosed by a loop of three heavily used rail tracks. Current access to and from the site is severely limited and constrained via an existing atgrade rail crossing, and by a one-way tunnel with substandard vertical clearance which requires manual flagging operation for non-concurrent movement in one direction. The Ports of Los Angeles and Long Beach (POLB) completed a joint rail study in December 2020 using current rail data and projections to identify future expansion needs over the next 25 years. Under opening year 2027 and year 2046 conditions, an estimated 1,325 and 3,030 trucks per day, respectively, will be blocked by trains (moving and stationary) for about 10 hours/day. The completion of this project will eliminate a significant truck access impediment into the TIMSF and connect the TIMSF to Terminal Way and Ferry Street. 2.2 Project B – Terminal Island Maritime Support Facility The proposed Terminal Island Maritime Support Facility (TIMSF) entails the following: • Redevelopment of the approximately 80-acres (Exhibit A) new backland facility will include removals (including contaminated soil removal), grading, paving, pavement marking, electrical and power infrastructure, high mast pole lighting, security fencing, storm water drainage system, low impact development improvements, sewage system, potable water, and fire protection. 7 • New electric charging stations. This site will operate using zero emission equipment and will include three (3) electric charging stations. • New roadability canopy, two (2) longshore restrooms, and two (2) guard booths. • Modifications to the existing tunnel access to the current TIMSF facility for emergency use only. The 80-acre backland site at 740 Terminal Way in San Pedro, CA 90731 on Terminal Island will be used for a permanent chassis support facility and container storage for three separate operators. The facility will support activities such as chassis dispatch, stacking and storage, maintenance, other roadability services, and stop/start functionality. The backland will be linked to the rest of the Port by the TIGS. POLA completed 23.3 acres of temporary site improvements (CMB pavement) to the existing 80-acre site in October 2021. This previous project was completed under emergency development to help alleviate vessel congestion by providing additional storage area to stack empty containers and chassis. The Scope of Work shall include, but is not limited to, project management, coordination, design, preparing drawings, specifications, engineering calculations, cost estimates, schedules, studies, and reports for: ? Architectural, civil, electrical, mechanical, plumbing, structural design, and traffic control; ? Geotechnical; ? Contract and record documents; ? Applying for and obtaining plan checks and permits; ? CAD drafting; ? Grant and/or funding support; and ? Engineering support during environmental assessment, bid, and construction. For questions regarding this RFP, please contact Tanisha Herr by email at THerr@portla.org. Questions must be submitted by 3pm, Thursday, August 3, 2023. The total Project budget for TIGS is approximately $39 million and for TIMSF is approximately $194 million.

Conceptual

Transportation Terminals

$233,000,000.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
489
Active Projects
236
Bidding Soon
3,711
All Active Projects
1,684
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 20, 2024

img_map_placeholder

Multiple Locations, Los Angeles, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.