EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 7, 2024 at 7:00 PM

Updated October 1, 2024

Site work, paving and renovation of a mixed-use development in Birdsboro, Pennsylvania. Completed plans call for the renovation of a playground / park / athletic field; for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; road / highway; road / highway; and road / highway.

As of December 11, 2023, the project has been awarded, however, a timeline for construction has not been confirmed. Exeter Township will accept sealed Prime bids for General Construction and Electrical Construction for improvements to Pineland Park, located at 420 Pineland Road, Birdsboro, PA 19508. The work will be done through a combination of forces / contractors. These include: o Township Forces (and Plumbing Contractor furnished by the Township) o General Contractor (Prime for pavilion/bathroom construction)) o Electrical Contractor (Prime) o Playground Contractor (materials and labor purchased by the Township through the PA COSTARS program.) Responsibilities of each entity is as follows: General Contractor (General Construction Bid): 1. Test bearing capacity of the soil by an approved method to ensure that it is 1500 P.S.F. or greater. Provide local structural engineer approval / seal for building slab and column footing design. This service can be supplied, at the contractor's option, by Cedar Forest Products. 2. Install slab and footing for pavilion / restroom. Coordinate wiring conduit and pipe locations with building layout and electrical and plumbing contractor. 3. Assemble / install building (to be purchased by Township) from Cedar Forest Products (see specifications). 4. Coordinate work in and around (5 feet from) building with the Electrical Contactor and Plumbing Contractor and Township. Electrical Contractor (Electrical Construction Bid) 1. Install electrical service to new building, supply and install circuit breaker to meet all applicable codes. 2. Install outlets, lights, and other building kit fixtures and devices. 3. Supply and install all miscellaneous parts, wiring, conduit, and other fasteners to make the work complete and functional in every way. 4. Coordinate work with General Contractor, Plumbing Contractor, and Township. Township / Township Forces / Plumbing Contractor (by Township): Demolition and site preparation 1. Sawcut Existing Asphalt Pavement 2. Remove and Dispose Existing Asphalt Walkway 3. Remove and Dispose Existing Asphalt Roadway 4. Remove and Dispose Existing Mulch 5. Remove and Dispose Existing Play Equipment 6. Remove and Dispose Existing Swings 7. Remove and Stockpile Existing Site Furnishings 8. Remove and Stockpile Existing Entrance Sign 9. Excavate Trench for Water and Plumbing Utilities 10. Grading and Earthwork Installation of new site improvements 1. Stake out of all work by General Contactor (building location) 2. Asphalt Pavement (Pedestrian) 3. Asphalt Pavement (Roadway) 4. Asphalt Stone Base Course, 6" thick 5. Recycled Rubber Wheel Stop 6. Crosswalk Striping 7. Detectable Warning Surface 8. Concrete Pavement, 4" thick 9. Concrete Stone Base Course, 6" thick 10. DCNR Brass Plaque on Cedar Wall Building 11. Interpretive Signage 12. Handicap Parking Sign 13. Handicap Symbol 14. Handicap Van Zone Striping (4" wide, blue) 15. Install Existing Entrance Sign 16. Lawn Mix 17. Warm Season Grass Mix Plumbing Contractor (through Township) 1. Installation of sinks, toilets, and all building plumbing 2. Supply water and sewer service to new building 3. Coordination with General Contactors, Electrical Contactor and Township. Playground Contractor (through the PA COSTARS Program) 1. Excavate area for playground, supply and install stone base, drainage piping, flush concrete curb, fibar engineering safety surface. 2. Supply and install playground equipment as specified. 3. Coordination with General Contactors, Electrical Contractor, and Township. Each Bid shall be accompanied by a certified check, bank money order, or a Bid Bond in an amount not less than 10 percent of the Bid total, payable to the Owner in accordance with the Instructions to Bidders. Laws and regulations applicable to this Contract include the following: Commonwealth of Pennsylvania "Steel Products Procurement Act" - Act No. 3 of l978 as amended. Pennsylvania Prevailing Wage Act (Act of 1961, P.L. 987, No. 442). Bidders are subject to all applicable provisions of the Pennsylvania wage laws, and bids shall be prepared accordingly. The applicable wage predetermination is included in the Project Manual. The successful bidder will be required to provide a performance bond in the amount of 100% of the successful bid amount. All contractors on this Project are required to ensure that employees and applicants will not be discriminated against because of race, creed, color, religion, sex, age, handicap, marital status, or national origins; and, that the statutes and regulations of federal and state law regarding non-discrimination are met. There will be no Prebid meeting. The Owner reserves the right, at its option, to waive as an informality any defects, errors, or omissions in any or all Bids; and to reject any or all Bids. Question Deadline 08/16/2023 at 4:00 PM ET *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. $230,000 -- $275,000.

Award

Playgrounds / Parks / Athletic Fields

$60,565.00

Public - City

Paving, Renovation, Site Work

18

12

3

Subscribe For Documents

94 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Play Field Equipment and Structures, Playground Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains
Division 26 - Electrical

Division 26 - Electrical

Electrical
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Water Utilities
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts

Find More Local Projects

Within 75 Miles of This Project
300
Active Projects
175
Bidding Soon
2,446
All Active Projects
1,149
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 22, 2023

December 22, 2023

img_map_placeholder

420 Pineland Rd, Birdsboro, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Pineland Park Playground Improvements Project - General Construction and Electrical Construction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.