Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 1, 2023 at 8:00 PM
Updated October 1, 2024
Site work, paving and renovation of a civil project in Georgetown, California. Completed plans call for the renovation of a water / sewer project; for site work for a water / sewer project; road / highway; and for paving for a road / highway.
127EAW23R0057 - GAOA Dru Barner CG Improvements El Dorado National Forest FAR 32.204 Disclosure of of the Construction Project: Between $250,000 and $500,000 Set Aside: Total Small Business Set Aside IMPORTANT NOTES: See Section L, Paragraph L.2 for the Documents to Submit with Your Proposal All Requests for Information (RFI's) shall be submitted to the Contracting Officer, Greg Cunningham, on the attached RFI form not later than 1300 hours PST, August 16th, 2022. A FS organized pre-proposal will NOT be held. The project locations are open to the public and can be viewed by each prospective offeror. In no event shall failure to inspect the constitute grounds for a claim after contract award. C.1 OF CONTRACT: The Eldorado National Forest proposes improvements to the Dru Barner Campground water system and access road. This project will replace the submersible pump in the vertical groundwater well at Dru Barner Campground, install a pole-mounted solar panel power system, install a security fence around the solar panels, clean the well, install power and control wiring, and install a water meter, iron filter system, booster pump, hydropneumatic tank, check valve, and a prefabricated building. Road improvements include roadbed reconditioning of the main loop road, placement of aggregate base in select areas, construction of rolling dip and rocked swale. Contractor shall furnish all material, labor, equipment, documentation, communication, notifications, and transportation as required to furnish and install the improvements described herein, as shown on the Project Plans, and as otherwise required by the Contract. All demolition, disposal, construction, and improvements described herein and as shown on the Project Plans are the responsibility of the Contractor. See attachment "1. Statement of Work" for further details. C.2 PROJECT LOCATON The Dru Barner Campground is located roughly 7 miles from Georgetown, California at 38_56'31" N, 120_45'57" W and an elevation of 3339 feet. From Georgetown drive northeast for 6 miles on Main Street/Wentworth Springs Road. Take a left on Bottle Hill Bypass Road, travel 1 mile, and then a left on Bottle Hill Road. Continue approximately 0.3 miles. The entrance to Dru Barner Campground is on the left. C.3 ESTIMATED START DATE / PERIOD OF (PoP) The estimated start date for this project is September 25th, 2023 with a 70 calendar day period of (PoP) after issuance of Notice to Proceed (NTP). C.4 OF CONSTRUCTION PROJECT FAR 32.204 - Disclosure of of the Construction Project: Between $250,000 and $500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Water / Sewer
$500,000.00
Public - Federal
Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 03 - Concrete
Division 05 - Metals
Division 09 - Finishes
Division 11 - Equipment
Division 13 - Special Construction
Division 22 - Plumbing
Division 28 - Electronic Safety and Security
Division 33 - Utilities
Division 35 - Waterways and Marine Construction
Division 41 - Material Processing and Handling Equipment
Division 48 - Electrical Power Generation
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 30, 2023
September 25, 2023

Bottle Hill Rd, Georgetown, CA
Related To This Project
Georgetown, CA
Bid Date: Sep 29 2023
Georgetown, CA
--
Georgetown, CA
Bid Date: May 10 2024
Georgetown, CA
--
Georgetown, CA
Bid Date: Feb 21 2025
Georgetown, CA
Bid Date: Apr 15 2025
Georgetown, CA
Bid Date: Apr 23 2025
Georgetown, CA
--
Georgetown, CA
Bid Date: May 16 2023
Georgetown, CA
Bid Date: Jan 31 2020
Georgetown, CA
Bid Date: Feb 08 2023
Georgetown, CA
Bid Date: Jan 26 2023
Georgetown, CA
--
San Bernardino, CA
Bid Date: Sep 12 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.