Site work and new construction of a retail development in Monticello, Georgia. Working plans call for the construction of a retail development; and for site work for a retail development.

As of February 28th, 2024, The bids received exceeded the funding then available. The Owner has applied for additional funding that it believes will enable the project to be built with some design revisions to reduce costs. The Owner understands the outcome of the additional funding application will be announced April 16 with the funding "project start date" of May 15, 2024. The building and the sitework will, this time, be bid as one project. The building, septic system, and well will have minor revisions; the sitework grading and graveling will have substantial revisions. The Owner has decided to not initiate design professionals' efforts to make design revisions and prepare documents for bid until the funding "project start date", May 15. It is estimated that the project will be advertised about July 15, 2024, with bids due about August 6, 2024. Construction of a new Jasper County Community Food Bank to be located at the Northeast corner of Freedonia at Middlebrook Pond Roads. This project is a 4,165 gsf pre-engineered enclosed metal building plus a 1,451 gsf covered drive-through. The building will include wood framed office partitions, 2 overhead doors, 4 hollow metal personnel doors, one truck dock, and will be fully air conditioned. Construction in this contract is limited to the building, earthwork extending ten feet from the building, and minor concrete slabs on the site. The balance of site work, septic system, and water well will be accomplished under a separate contract(s) Per Bill Nash please contact him directly for documents. Will only send to contractors. For construction of the Jasper County Community Food Bank located at Freedonia and Middlebrook Pond Roads, Monticello, GA 31064.The funding is provided, in part, by a Community Development Block Grant, and applicable portions of the work must conform to Davis Bacon Wage Rates. Bidders must provide E-verify and Section 3 compliance information as well. A. All contracts are subject to Federal and State contract provisions by the Georgia Department of Community Affairs (DCA) and the U.S. Department of Housing and Urban Development (HUD). B. This project is covered under the requirements of Section 3 of the HUD Act of 1968, as amended and Section 3 Business Concerns are encouraged to apply. C. This project also abides by the following laws as they pertain to HUD Assisted Projects: Title VI of the Civil Rights Act of 1964; Section 109 of the Housing and Community Development Act of 1974, Title 1; Title VII of the Civil Rights Act of 1968 (Fair Housing Act); Section 104(b)(2) of the Housing Community Development Act of 1974; Section 504 of the Rehabilitation Action of 1973 as amended; Title II of the Americans with Disabilities Act of 1990 (ADA); and the Architectural Barriers Act of 1968. D. Contracts for this project must include but are not limited to provisions covering: Equal Employment Opportunity (E.O. 11246) as supplemented by (41 CFR, Part 60); Copeland "Anti-Kickback" Act (18 U.S.C. 874) as supplemented by (23 CFR, Part 3); Davis-Bacon Act (40 U.S.C. 27ato a-7) as supplemented by (29 CFR, Part 5); Sections 103 and 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C. 327-330) as supplemented by (29 CFR, Part 5); Section 306 of the Clean Air Act (42 U.S.C. 1857(h)) or Section 508 (33 U.S.C. 1368); Debarment and Suspension (Executive Orders 12549 and 12689); Byrd AntiLobbying Amendment (31 U.S.C. 1352); Drug-Free Workplace requirements; Section 6002 of the Solid Waste Disposal Act, as amended. All Bidders must submit E-verify Affidavits with Bids. Bids will be received for Single Prime. All proposals shall be lump sum. Construction of a new Jasper County Community Food Bank to be located at the Northeast corner of Freedonia at Middlebrook Pond Roads. This project is a 4,165 gsf pre-engineered enclosed metal building plus a 1,451 gsf covered drive-through. The building will include woodframed office partitions, 2 overhead doors, 4 hollow metal personnel doors, one truck dock, and will be fully air conditioned. Constructionin this contract is limited to the building, earthwork extending ten feet from the building, and minor concrete slabs on the site. The balance of site work, septic system, and water well will be accomplished under a separate contract(s). Payment of the contract amount will be made on a periodic basis on applications for payment from the Contractor and approved by the Architect based on work accomplished. Further details regarding payment provisions of the Contract are contained in following sections of Project Manual. All bids must be accompanied by a Bid Bond in an amount not less than 5% of the amount bid. The Successful Bidder, if awarded the Contract, will be required to furnish a Performance Bond and Payment Bond, each in the amount of 100% of the Contract Amount. The surety company on the contract Performance Bond shall be a surety company authorized to do business in the State of Georgia. Said bond and surety shall be subject to approval by the attorney for the Owner. Proof of General Liability Insurance and Workman's Compensation Insurance will be required with the Jasper County Board of Commissioners listed as an additional insured. All contractors are hereby notified that they must have proper license as required under the state laws governing their respective trades. Attorneys-in-fact who sign Bid Bonds must file with the bond a certified and effectively dated copy of their Power of Attorney. This shall be attached to the Bid Bond. The Owner reserves the right to reject any and all bids, to waive informalities, to waive minor irregularities, and to accept the lowest or best bid. No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of 45 days Questions must be submitted via email to Bill Nash, whnashjr@gmail.com not later than 11:59 PM August 27, 2023

Final Planning

Retail

$916,760.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
48
Bidding Soon
1,467
All Active Projects
569
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 6, 2023

September 18, 2024

img_map_placeholder

Freedonia Rd & Middlebrook Pond Rd, Monticello, GA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.