BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Wellington, Florida. Conceptual plans call for the renovation of a educational facility.

As of October 6, 2023, this project has been postponed until further notice. Award anticipated for November 2023. Details regarding design and construction have not been identified. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: Scope/Program Verification Report, Statement of Probable Construction Cost, Project Schedules, Phasing of Design Plans as directed by the OWNER, Completion of the permitted Construction Documents within the specified Design Schedule, Life Safety/FISH Plans, FF&E Schedule & Specifications, Design Calculations, Life Cycle Cost Analysis, Color Charts, and Finish Schedules. The ARCHITECT shall provide all professional services necessary to deliver Permitted Construction Documents within the established GMP Construction Budget and in accordance with the established Design Schedule. The ARCHITECT shall provide validation of the Owner’s 2016 Facilities Assessments Surveys known as the Referendum List and identify any additional design services necessary and approved by the District to establish the permitted design documents as required and directed by the District staff including, but not limited to: ADA and CSIR compliance requirements; the renovation and repair of building envelope items such as exterior doors, stucco finish, gutters and downspouts, and water intrusion/waterproofing applications; signage; fire alarm/panel upgrade and fire alarm/smoke and duct detector replacement; sheet metal ductwork/outside air dampers; gym floor-refinishing; athletic lighting; bleacher repairs; boiler replacement; parking lot paving/striping; playground improvements; outside area scoreboards replacement; vinyl flooring; plumbing work related to the drinking water fountains, bathroom replacement and water and sewer lines; roof repairs and other Work as may be required. Required deliverables include, but are not limited to: Scope/Program Verification Report, Statement of Probable Construction Cost, Project Schedules, Phasing of Design Plans as directed by the OWNER, Completion of the permitted Construction Documents within the specified Design Schedule, Life Safety/FISH Plans, FF&E Schedule & Specifications, Design Calculations, Life Cycle Cost Analysis, Color Charts, and Finish Schedules. The ARCHITECT will be required to certify the permitted design complies with one of the energy-efficient and sustainable building standards per F.S. 255.2575. The Architect, Engineers, and Construction Manager at Risk shall certify that the permitted design does not exceed the established GMP construction budget. The Permitted Design must incorporate all requirements set forth in the Florida Building Code, Florida Accessibility Code, District Master Specifications, District Design Criteria, and all other applicable specifications, and authorities having jurisdiction. Question Deadline 08/21/2023 at 2:00 PM ET PERMITTED CONSTRUCTION DOCUMENTS - SEPTEMBER 11, 2024

Conceptual

Educational

$3,422,227.00

Public - County

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
281
Active Projects
136
Bidding Soon
1,982
All Active Projects
834
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 16, 2024

img_map_placeholder

8499 Forest Hill Blvd, Wellington, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.