BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Hampton, South Carolina. Completed plans call for site work for a water / sewer project.

Project is included in the Capital Improvement Plan for FY2024-2028. As of June 5, 2024, construction commenced on February 27, 2024, and is anticipated to continue for about eighteen months. Work on the seawall will continue from the end of Phase 3 at King St to the High Battery connection on E Battery St. Completion expected in 2025. Work: The King Street intersection will be opened first as soon as all work items are complete (paving, hardscape, ect) to allow for traffic. The high battery inspections will occur once King Street is opened Low Battery Wall will be raised 1.8' to match the elevation of the high battery wall. The road is being reconstructed and vegetation will be planted along the project limits. *Bid included below for reference The City of Charleston is seeking the services of a qualified Contractor for a Construction Manager At-Risk (CMAR) contract for the Low Battery Seawall Rehabilitation Project - Phase IV. Engineering and Design Services for the Project will be performed by Johnson, Mirmiran and Thompson (JMT). The CMAR Contractor will collaborate with the Design Team during the Pre-Construction Phase to facilitate constructability, cost control, scope management, temporary works planning and design, and other project elements as fully described in the scope of services. Construction of Phase III is currently underway and is scheduled to be completed in October 2023. Phase IV of the Low Battery Restoration Project extends along Murray Boulevard and East Battery Street, between the end of Phase III and the intersection of South Battery Street in the City of Charleston, SC. In conjunction with the rehabilitation of the wall, the existing roadway and storm drainage system will be also replaced. An investigation and repair procedure will also be included for the High Battery Seawall from the Turn to South Battery. The CMAR Contractor will collaborate with the Design Team throughout the Pre-Construction Phase and provide input to the design pertaining to constructability, means and methods, sequencing, temporary works, cost and schedule to prepare for successful execution of the construction of this Project. The Design Team and the CMAR Contractor will prepare final, coordinated Construction Documents that detail the proposed Project. The Contractor should have the ability to meet Minority & Women-Owned Business Enterprise (MWBE) criteria established by the City. Questions are to be submitted in writing no later than 3:00pm on August 16, 2023 to robinsonr@charleston-sc.gov.

Under Construction

Water / Sewer

$26,170,914.00

Public - City

Site Work

75

3

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
95
Bidding Soon
1,092
All Active Projects
512
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 5, 2023

February 27, 2024

img_map_placeholder

Multiple Locations, Hampton, SC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.