Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 20, 2023 at 7:00 PM
Updated January 29, 2026
Site work for a water / sewer project in Palm Desert, California. Completed plans call for site work for a water / sewer project.
As of December 20, 2023, the project has not been awarded. A timeline for award has not been confirmed. 1. The project consists of installing approximately 21,454, linear feet of 30-inch and 4,429 linear feet of 12-inch diameter water main pipe with restrained joints, including valves, fittings, polyethylene encasement, imported sand, testing, disinfection, clearing and grubbing, excavation, backfill and compaction of backfill, potholing all utility crossings, surface restoration and all necessary appurtenances complete and in place. The pipeline work also includes: excavation of jacking and receiving pits, shoring of trenches and pits as required, pipe jacking operations, and all related backfill and compaction. Portions of the pipeline will cross above ground the Coachella Valley Stormwater Channel, Buchanan Street Channel and Lincoln Street Channel within a steel casing with pipe bridge supports, rip rap removal and replacement, and concrete slope protection as indicated in the Contract Documents. 2. Existing CVWD Irrigation Lateral Nos. 97.1-4.3 and 98.0 shall be replaced as indicated in the Contract Documents. 3. Installation of the Pressure Reducing Station includes, but is not limited to, clearing and grubbing, grading, excavation, compaction, installation of concrete pad, security fence, new electrical service, all piping, 12-inch diameter zinc-coated restrained joints and V-Bio Polyethylene encased ductile iron pipe, connections, pipe supports, and all mechanical components as indicated in the Contract Documents. 4. Destruction of Manuela Garcia Mobile Home Park well, removing and disposing of all well appurtenances, remove connection to existing potable water system, connection to the public water system and associated onsite work as indicated in the Contract Documents. 5. Saint Anthony Mobile Home Park and Seferino Huerta Mobile Home Park remove connection to existing potable water system well and connect to the public water system and associated onsite work as indicated in the Contract Documents. 6. Work shall also include protecting in place or removing and replacing all existing utilities and private and public improvements, including, but not limited to, curbs, gutters, concrete pavement, asphalt concrete pavement, landscaping, landscaping irrigation facilities, traffic striping, power poles, guy wires, street lights, signs, fences, and walls. License Requirements Class A License Liquidated Damages Reverse Liquidated Damages: $2,500/Day and Liquidated Damages: $3,000/Day Question Deadline 09/27/2023 at 5:00 PM PT Online Q&A Yes Arrangements may be made for visiting the Site by contacting CVWD's Representative.
Bid Results
Water / Sewer
$32,866,904.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 24, 2023
December 25, 2023
Multiple Locations, Palm Desert, CA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
