Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 18, 2025 at 7:00 PM
Updated April 3, 2025
Demolition, site work, new construction and renovation of an educational facility in Plano, Texas. Working plans call for the demolition of a educational facility; for the construction of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.
As of January 24, 2025, renovation plans will be going for review for with the City of Plano on February 3rd. A construction timeline has not been established. Construction of a new Middle School (Grades 6-8) approximately 152,000 SF. Site conditions such as circulation, fire lanes, parking, and landscape/irrigation should also be examined and included in the work and overall plan. The new middle school will be built on the existing Haggard MS site to replace the current campus. The existing building will remain in use during the construction of this project. Great care will be given to protect and maintain the present site, building, services, infrastructure, security and access. Multiple construction phases may be considered to accomplish the work of this project. Once the new building is complete then the existing can be demolished. NOTE: We anticipate that code will require a storm shelter. The existing track will be removed to make room for the new building, and when relocating the new track it will need to be a 4-lane synthetic track. The existing softball field on the adjacent Plano Senior High campus in our initial mapping may also be in the way of the new building in which case it will need to be demo'd and relocated as well. ESTIMATED BUDGET AND LOCATION Estimated Construction Budget - $84,615,000 Date for Construction Agreement: Presented to the Board on or about October 3, 2023. Owner reserves the right to reject any or all bids and to waive irregularities or informalities as may be deemed in Owner's interest. For additional information, see the Instructions to Proposers in the Proposal documents for each project or call the PISD Purchasing Department 469-752-0291. The Board of Trustees, for the purpose of complying with Section 2258, Subchapter B of the Texas Government Code for all public contracts, has adopted the prevailing wage rates as determined by the United States Department of Labor in accordance with the Davis-Bacon Act as the published rates for the District. Question Cuttoff Date & Time 8/15/2023 04:00:00 PM (CT) Design Initiated: 7/2023 Anticipated Design Completion: 11/2024 Expected Construction Start: 2/2025 Scheduled Construction Completion: New Building, paving and drives 7/2026 Demo of the existing building, and building of the new track 12/2026
Pre-Construction/Negotiated
Educational
$90,000,000.00
Public - City
Demolition, New Construction, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 22, 2023
February 19, 2025
2832 Parkhaven Dr, Plano, TX
Related To This Project
Plano, TX
Bid Date: Aug 22 2023
Plano, TX
--
Plano, TX
Bid Date: Oct 09 2023
Plano, TX
--
Plano, TX
--
Plano, TX
Bid Date: Jan 23 2025
Plano, TX
--
Plano, TX
--
Plano, TX
Bid Date: Aug 22 2023
Plano, TX
Bid Date: Aug 22 2023
Plano, TX
--
Plano, TX
--
Plano, TX
--
Plano, TX
--
Plano, TX
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
