BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, new construction and renovation of an educational facility in Plano, Texas. Completed plans call for the demolition of a educational facility; for the construction of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

Construction of a new Middle School (Grades 6-8) approximately 152,000 SF. Site conditions such as circulation, fire lanes, parking, and landscape/irrigation should also be examined and included in the work and overall plan. The new middle school will be built on the existing Haggard MS site to replace the current campus. The existing building will remain in use during the construction of this project. Great care will be given to protect and maintain the present site, building, services, infrastructure, security and access. Multiple construction phases may be considered to accomplish the work of this project. Once the new building is complete then the existing can be demolished. NOTE: We anticipate that code will require a storm shelter. The existing track will be removed to make room for the new building, and when relocating the new track it will need to be a 4-lane synthetic track. The existing softball field on the adjacent Plano Senior High campus in our initial mapping may also be in the way of the new building in which case it will need to be demo'd and relocated as well. ESTIMATED BUDGET AND LOCATION Estimated Construction Budget - $84,615,000 Date for Construction Agreement: Presented to the Board on or about October 3, 2023. Owner reserves the right to reject any or all bids and to waive irregularities or informalities as may be deemed in Owner's interest. For additional information, see the Instructions to Proposers in the Proposal documents for each project or call the PISD Purchasing Department 469-752-0291. The Board of Trustees, for the purpose of complying with Section 2258, Subchapter B of the Texas Government Code for all public contracts, has adopted the prevailing wage rates as determined by the United States Department of Labor in accordance with the Davis-Bacon Act as the published rates for the District. Question Cuttoff Date & Time 8/15/2023 04:00:00 PM (CT)

Post-Bid

Educational

$84,615,000.00

Public - City

Demolition, New Construction, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
79
Bidding Soon
3,558
All Active Projects
1,302
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.