BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 7, 2023 at 8:00 PM

Updated January 27, 2024

Site work for a playground / park / athletic field in Grand Junction, Colorado. Completed plans call for site work for a playground / park / athletic field.

Reference Number 0000326617 *The City of Grand Junction is soliciting competitive bids from qualified and interested Contractors for all labor, equipment, and materials required for the Westlake Park Irrigation System Construction. All dimensions and Scope of Work shall be verified by Contractors prior to submission of bids.* Question Acceptance Deadline 08/17/2023 at 5:00 PM MT Questions are submitted online No General Requirements - FOB Destination - FOB Pre-Paid - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % The goal of the Westlake Park Irrigation System Project is to replace the entire irrigation system. This Project will replace all mainline, lateral line, communication lines, valve, and sprinklers in the park to provide even and efficient water distribution to the existing grass and the future improvements of the park. This Project includes the material sourcing and installation of the communication system, the filtration system, the drip system, and sprinkler systems, while installing and maintaining the tree protection zones provided in the plan set. During this Project's work, the sidewalks, playgrounds and skateparks are to stay open and clean. The disk golf course will be closed. Open trenches will be made obvious to park users and back filled/water settled once pipe is installed. The pump house will be reconfigured using the existing pump. At completion of the Project, the selected Contractor will provide the City with an accurate as built document and GPS coordinates for valves, mainlines (every 20'), and the communication path (every 20'). The Contractor will provide a warrantee on all work for 1 year after the date of completion.

Bid Results

Playgrounds / Parks / Athletic Fields

$636,766.00

Public - City

Site Work

12

5

6

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
20
Bidding Soon
145
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2023

September 28, 2023

Project location map

325 W Orchard Ave, Grand Junction, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.