BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 4, 2024 at 7:00 PM

Updated January 26, 2024

Site work and addition to a clubhouse / community center in Brampton, Ontario. Conceptual plans call for site work for a clubhouse / community center.

The scope of work encompasses all requisite professional design, engineering, manufacturing, construction, supply, and installation of all equipment and services necessary to construct one (1) fabric membrane structure including artificial turf and perform all associated work at the Flower City Community Campus (FCCC) cricket field in the City of Brampton. TIMELINE: Tender was cancelled. Whether or not project will be re-tendered are unconfirmed. Coverage of this report is discontinued at this time.

Project Abandoned

Clubhouse / Community Centers

Public - City

Addition, Site Work

9

8

13

10

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
4
Bidding Soon
2,500
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2023

March 1, 2024

Project location map

8850 McLaughlin Rd S, Brampton, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.