BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a playground / park / athletic field in Hot Springs National Park, Arkansas. Completed plans call for the renovation of a playground / park / athletic field.

The project is located at the USDA Forest Service Ouachita National Forest Seed Orchard about 3 miles east of Mount Ida, Arkansas off Hwy 270 on Seed Orchard Road and Albert Pike Recreation Area about 6 miles north of Langley, Arkansas at the north end of Highway 369. The contractor shall provide all labor, tools, equipment, and materials to Remove the existing vault toilet at the Seed Orchard and relocate it to the Albert Pike Recreation Area Loop A day use area in the location shown on the plans. Build an ADA compliant concrete sidewalk from the designated parking spot to the vault toilet entry Extend the ADA compliant parking space and access aisle about 10 feet forward of the existing paving (approximately 200 square feet). Provide signage and appropriate pavement markings for an ADA van accessible parking spot Backfill the excavation at the Seed Orchard. Provide grading and vegetation at both sites as required Period of Performance: 09/15/2023 to 01/15/2024 Questions due 14 August 2023 by 1200 EST MAGNITUDE OF CONSTRUCTION PROJECT $25,000 - $100,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Playgrounds / Parks / Athletic Fields

$100,000.00

Public - Federal

Renovation

6

15

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
26
Bidding Soon
273
All Active Projects
124
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2023

September 15, 2023

img_map_placeholder

100 Reserve St, Hot Springs National Park, AR

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.