Renovation of an educational facility in Whitewater, Wisconsin. Completed plans call for the renovation of a educational facility.
As of October 9, 2023, an architect has been selected and this project is in the design phase. Although a firm timeline for construction has not been determined, construction is expected to start in April 2025 and end in June 2027. *The closed solicitation has been included below for reference: UNIVERSITY OF WISCONSIN - WHITEWATER CAMPUS Project Description and Scope The project scope consists of the renovation and replacement of two eleven-floor traction passenger elevators, and one two-floor hydraulic freight elevator and related equipment in Wells East Residence Hall. It would also include the renovation and replacement of two eleven-floor traction passenger elevators, and one two-floor hydraulic freight elevator and related equipment in Wells West Residence Hall. Due to the size of the project work on the traction passenger elevators would need to occur one elevator at a time in each building and be spread over two summer construction seasons. Elevator modernization includes the replacement of all machine room equipment and control systems. Elevator doors, equipment and control stations would be upgraded to meet ADA requirements. An elevator monitoring system would be installed. Fire Fighter Service operation would be provided. A fully regenerative drive would be installed on the traction passenger elevators. Heating and cooling improvements to the equipment room would be implemented to satisfy the equipment warranty. Existing exhaust and heating systems would be evaluated and renovated as required. New split type, direct expansion air conditioning systems to provide additional cooling for new controllers may be considered for machine rooms. Electrical feeders currently serving the elevators would need to be evaluated and replaced back to the source panel if they do not have sufficient capacity to support the new elevators. Elevator machine rooms would receive a dedicated electrical panel for serving all the loads associated with the elevators. New industrial LED fixtures would be provided in machine rooms and in hoistways. Lighting in elevator lobbies would be evaluated and upgraded to provide 10 foot candles at elevator sills. Existing elevator machine rooms should be evaluated in terms of provision for smoke and heat detectors and fire alarm control modules for elevator recall functions, speaker and strobe notification devices and manual pull stations. The design consultant will work with the university to make and document prioritized recommendations for (a) the overall proposed scope of work and (b) the proposed scope of work per building to assist the university in keeping the project within budget. Project Schedule: Start Project: Apr 2025 Substantial Completion: Aug 2026 Project Close Out: Jun 2027
Bid Results
Educational
$2,170,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 05 - Metals
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 14 - Conveying Equipment
Division 21 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 23, 2024
April 1, 2025
800 W Main St, Whitewater, WI
Related To This Project
Whitewater, WI
Bid Date: Aug 21 2023
Whitewater, WI
Bid Date: Dec 05 2024
Whitewater, WI
Bid Date: Nov 30 2021
Whitewater, WI
Bid Date: Nov 11 2021
Whitewater, WI
Bid Date: Feb 09 2022
Whitewater, WI
Bid Date: Jan 26 2022
Whitewater, WI
Bid Date: Nov 30 2021
Whitewater, WI
Bid Date: Nov 02 2021
Whitewater, WI
Bid Date: Aug 02 2023
Whitewater, WI
--
Whitewater, WI
Bid Date: May 09 2024
Whitewater, WI
Bid Date: Feb 01 2024
Whitewater, WI
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Share with your network.
Wells Hall Elevator Modernization - University of Wisconsin System
Project Shared
with
example@example.com
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.