BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 26, 2023 at 8:00 PM

Updated January 27, 2024

Site work for a water / sewer project in Carrington, North Dakota. Completed plans call for site work for a water / sewer project.

Site Directions: The pipeline alignment is located southeast of Carrington, North Dakota, approximately 4 miles south of Highway 200, from 76th Avenue to 83rd Avenue. Est. Value Notes: $60.9 million Est. Completion Date: July 31, 2026 The Work generally consists of furnishing and installing approximately 43,000 feet of 72-inch diameter steel water pipeline, including two 96-inch diameter trenchless creek/river crossings and one 96-inch diameter trenchless gas line crossing. The Work also includes an impressed current pipeline corrosion protection system, pipeline appurtenances, and all other work as fully described in the Contract Documents.

Bid Results

Water / Sewer

$69,135,254.00

Public - City

Site Work

57

26

13

7

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 21, 2023

November 15, 2023

Project location map

Multiple Locations, Carrington, ND

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.