BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Mount Pleasant, Michigan. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

Reference Number 0000326787 Mill Pond Park Weir & Pedestrian Bridge Repairs and Chipp-a-waters Park Riverbank Restoration - Professional Engineering Services The City of Mt. Pleasant is seeking proposals for the design of the Mill Pond Park Weir & Pedestrian Bridge Repairs and Chipp-A-Waters Park Riverbank Restora-tion Project. The Mill Pond Park Weir & Pedestrian Bridge (43.6021, -84.7839) is a cast-in-place concrete weir structure maintaining a difference in up-stream/downstream water levels of approximately 4 feet (a parallel branch of the river runs through a series of rock dam weirs). The substructure consists of con-crete abutments at the east and west ends of the structure, two intermediate concrete piers and concrete wingwalls in the southwest and southeast quadrants. The substructure supports a cast-in-place concrete deck span carrying the non-motorized trail with timber railings mounted to either side of the deck. The City recently obtained an evaluation of the structure that recommended the following: In-depth evaluation of the concrete spillway structure. Removal of woody debris from the upstream ends of the piers. Patching, crack repair and waterproofing of the substructure units. Epoxy overlay of the concrete deck. Replacement of timber railings. Tree removal and clearing around the footprint of the structure. Slope stabilization. Asphalt trail repairs (anticipating damage during construction). Question Acceptance Deadline 08/18/2023 12:00 AM EDT Questions are submitted online Yes The City of Mt. Pleasant reserves the right to accept or reject any or all bids, to waive any irregularities in the bids, and to select the bid considered most advantageous to the city.

Conceptual

Bridges / Tunnels

$3,000,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
39
Bidding Soon
661
All Active Projects
286
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2024

img_map_placeholder

To Be Determined, Mount Pleasant, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.