BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a municipal facility in Pensacola, Florida. Completed plans call for the demolition of a municipal facility; for the construction of a municipal facility; and for site work for a municipal facility.

This project will be to deconstruct two existing buildings located at 416 and 450 W. Herman Street and reconstruct them at two separate County-owned parcels at the Road Department and Buelah Landfill. Question Submission Deadline:August 22, 2023, 5:00pm Escambia County desires to have two (2) existing prefabricated metal buildings located at 450 W Herman Street (Building 1) and 416 W Herman Street (Building 2) deconstructed and reconstructed at two (2) different locations; 601 Highway 297-A (Building 1), Cantonment, Florida and 13009 Beulah Road (Building 2), Cantonment, Florida A current General Connectors license will be required to submit a bid. Demolish the existing 100'x 80' building located at 450 Herman Street to the new location at 601 Highway 297-A. Assemble the 100'x80' building on a concrete pad to be provided by Escambia County. The metal roof has a coating applied which may cause extra effort to remove. The contractor shall be responsible for all materials needed to reassemble the building on the new slab, with new openings as outlined below. Install new roof panels and rake trim, base angle, and base trim. The contractor shall install four (4) 14'x14' roll-up doors in place of the existing roll-up doors that currently exist. All existing pedestrian doors shall be relocated to their existing positions. Demolish the existing 75'x68' building located at 416 Herman Street and relocate to 13009 Beulah Road. Assemble the 75'x68' building on a concrete pad to be provided by Escambia County. The contractor shall replace the existing roll-up doors with four (4) 14'x14' roll-up doors to be installed at a location to be determined by County personnel during reconstruction. The existing metal pedestrian doors shall be relocated in their existing positions. The existing glass storefront door will be relocated to the opposite side of the building from its current location.

Award

Municipal

$451,975.00

Public - County

Demolition, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
29
Bidding Soon
437
All Active Projects
209
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 6, 2023

October 6, 2023

img_map_placeholder

Multiple Locations, Pensacola, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.