BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Dublin, Ohio. Contact the soliciting agency for additional information.

The City of Dublin respectfully requests that a quote for the professional services Project Identification :The City of Dublin is seeking a professional evaluation and recommendation of the best practices for sidewalk and roadway brick paver and granite curb maintenance and repair to help the City to better plan, prioritize, design, and estimate maintenance of City brick paver assets. Services Requested Overview: Determine best practices for the maintenance of roadway and sidewalk brick paver areas, including permeable pavers and pavement and granite curbs in the Bridge Park and Historic Dublin areas. Determine and estimate best maintenance practices and frequency, provide recommendations on how to assess assets, and prioritize areas in need of maintenance or repairs in the next 5 years. Detailed Description a. Inventory - Review roadway and sidewalk brick and paver inventory in the Bridge Park and Historic Dublin areas. Identify missing areas of which Dublin is responsible for maintenance. Areas shall be identified on an aerial map for incorporation into the GIS system. b. Roadway Pavers - Areas to include any roadway brick paver area (e.g. intersections and crosswalks) in Historic Dublin and Bridge Park. Determine best practices for the maintenance of the roadway pavers with a detailed maintenance list (sandling, washing, etc.) and schedule (annual, every 2 years, every 3 years, etc.). Identify areas in need of repair in the next 5 years with a prioritized list complete with planning level estimates. c. Permeable Pavers - Areas to include all permeable paver parking areas in in Historic Dublin and Bridge Park areas. Determine best practices for the maintenance of the permeable pavers with a detailed maintenance list (flushing, vacuuming, etc.) and schedule (annual, every 2 years, every 3 years, etc.). Identify areas in need of repair in the next 5 years with a prioritized list complete with planning level estimates. d. Sidewalk Pavers and Bricks - Areas to include brick paver sidewalk and pedestrian areas, excluding crosswalks (part of roadway), in Historic Dublin and Bridge Park areas. Determine best practices for the maintenance of the sidewalk pavers and bricks with a detailed maintenance list (sandling, washing, etc.) and schedule (annual, every 2 years, every 3 years, etc.). Identify areas in need of repair in the next 5 years with a prioritized list complete with planning level estimates. e. Granite Curbs - Areas to include granite curb locations in the Bridge Park area. Determine best practices for the maintenance of the granite curbs with a detailed maintenance list and schedule, if any. Identify areas in need of repair in the next 5 years with a prioritized list complete with planning level estimates. f. References - Benchmark and reference the following sources to provide recommendations: City of Columbus procedures, manufacturers recommendations, and other cities of equal community expectations and aesthetic maintenance. D. Attachments: A web map of the identified roadway paver areas. This map is only for roadway pavers. Consultant is to identify areas not currently included in the inventory. Web map link E. Deliverables: A report including findings and recommendations of all requested items in Sections A, B, and C above, including all referenced documents and information. The report shall be delivered in both PDF and Microsoft Word format. Two physical copies of the final report shall be assembled and delivered to the City of Dublin project manager. Project Completion Time: The completion time for this project shall be 90 days from the execution of the Contract, but no later than December 31, 2023. Project Contact Robert Taylor, P.E., Director - Asset Management & Quality Assurance rjtaylor@dublin.oh.us 614.410.4775 The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
59
Bidding Soon
1,520
All Active Projects
515
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2023

img_map_placeholder

Multiple Locations, Dublin, OH

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.