BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Ann Arbor, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of October 24, 2023 this project has not yet been awarded. The award info is available after 11/20. Reference Number 0000326986 To provide concrete installation, replacement, and repair services for Public Works within the City of Ann Arbor. Question Acceptance Deadline 08/14/2023 03:00 PM EDT Questions are submitted online No All questions shall be submitted on or before August 14, 2023, at 3:00 p.m. (local time), and should be addressed as follows: Scope of Work/Proposal Content questions shall be e-mailed to Kevin Schneider - Public Works Supervisor - Kschneider@a2gov.org RFP Process and Compliance questions shall be e-mailed to Colin Spencer, Buyer - CSpencer@a2gov.org Each bid must be accompanied by a certified check or Bid Bond by a surety licensed and authorized to do business within the State of Michigan, in the amount of 5% of the total of the bid price During the term of this contract, the Contractor and the City will have routine pre-construction meetings. The City will at this point give the Contractor the proposed scope and order of work, along with authorization to begin work. These meetings are intended to give the Contractor an estimated quantity and scope of work. Additional work will also be added throughout the construction season on an asneeded basis. As work is proposed, the City and Contractor shall agree on a date by which all proposed work shall be completed. Unless otherwise agreed upon when the scope of work is provided to the contractor, the date of completion shall be 30 calendar days from when the scope of work is provided to the Contractor. If a scope of work greater than 15% of the contract value is provided to the Contractor at any one time, the Contractor shall be permitted to an extended time of completion. Any work that is not completed within the agreed time, including any extension granted in writing by the Project Supervisor, shall obligate the Contractor to pay to the City, as liquidated damages and not as a penalty, an amount equal to $150.00 for each calendar day of delay in the completion of all the work.

Bid Results

Roads / Highways

$358,452.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
72
Bidding Soon
1,401
All Active Projects
554
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2023

September 28, 2023

img_map_placeholder

Multiple Locations, Ann Arbor, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.